7 Prerequisites
for
installation
This section looks at the issues that must be
dealt with before installation.
7.1
Requirements relating to the
installation site
The environmental conditions set out in the
climate classi cation must be observed.
see
Section 1.2.2 Climate class of the unit in
accordance with IEC 721-3-3
The ground must be suitable for dowelling the
unit.
When drilling, ensure that no damage oc-
curs to under oor heating or similar instal-
lations in the ground.
7.2 Technical documents required
Always necessary
Technical documentation
Drawings:
In general, the ground plan and view are en-
closed. (see
Fig. 7.2-1
)
May be necessary, depending on project
further applicable documents, see
General under
Further Applicable Documents
•
•
Summary of Contents for Argus HSG-E02
Page 6: ...Technical documentation Argus HSG...
Page 12: ...12 Fig 1 1 5 1 30656E Technical documentation Argus HSG...
Page 13: ...13 Fig 1 1 5 2 30656E Technical documentation Argus HSG...
Page 14: ...14 Fig 1 1 5 3 30656E Technical documentation Argus HSG...
Page 18: ...18 30656E Technical documentation Argus HSG...
Page 44: ...44 30656E Technical documentation Argus HSG...
Page 50: ...50 30656E Technical documentation Argus HSG...
Page 54: ...54 30656E Technical documentation Argus HSG...
Page 62: ...62 30656E Technical documentation Argus HSG...