
95
03.13 EN
4.14.2 Operating the lift mechanism with the MULTI-PILOT
Lifting and lowering
Requirements
– To prepare the truck for operation, see
"Preparing the truck for operation" on page 76
Procedure
• Pull the MULTI-PILOT (78) in direction H to
raise the load.
• Push the MULTI-PILOT (78) in direction S to
lower the load.
The load is now raised / lowered.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
Tilting the mast forward / backward
Requirements
– Truck prepared for operation, see "Preparing the
truck for operation" on page 76.
Procedure
• Push the MULTI-PILOT lever (78) in direction V
to tilt the mast forward.
• Push the MULTI-PILOT lever (78) in direction R
to tilt the mast back.
The mast is now tilted back / forward.
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
H
H
S
78
V
R
78
Summary of Contents for DFG 425s
Page 1: ...DFG TFG 425s 435s G 10 07 Operating Instructions 51077936 51209061 01 09 03 13 ...
Page 3: ......
Page 5: ...03 13 EN 4 ...
Page 15: ...03 13 EN 14 ...
Page 24: ...23 03 13 EN ...
Page 41: ...03 13 EN 40 ...
Page 46: ...45 03 13 EN Fuelling is now complete ...
Page 53: ...03 13 EN 52 ...
Page 192: ...191 03 13 EN t Series equipment o Optional equipment ...