Page 25
| Fathom
ICS
Figure 19
IN-CEILING INSTALLATION
Type: IC-2
Mounting the Enclosure cont’d...
Place an L-Bracket (Part J) at one
of the corner ends of the enclosure,
with its slotted openings positioned
over the pilot holes. Select two,
non-adjacent pilot holes within
each slotted opening (one to two
holes apart) and fully install two #8
x 1.00-inch pan head screws.
Note:
Substitute #8 x 1.50-inch pan head
screws at any pilot holes positioned
directly over the enclosure.
Then,
partially back out each screw,
leaving just one to two threads
exposed beneath each screw head.
The L-Bracket should remain loose,
allowing it to slide for adjustment
during installation.
(Figure 19)
Slide the L-Bracket (Part J)
outward and secure to the ceiling joist
using six #8 x 1.25-inch wafer head
screws. Repeat this procedure with
the remaining L-Brackets (Part J)
at the remaining corner ends of the
enclosure. Next, fully tighten all screws
previously installed in the slotted
openings and lock the position of all
L-Brackets (Part J) by installing a #8 x
1.00-inch pan head screw into one of
the two holes located in between the
slotted openings.
(Figure 20)
Uninstall all screws from all
Joist Mounting Brackets (Parts
E & F) and remove for recycling.
Uninstall all screws from both
Extended Stud Mounts (Parts G
& H) and remove for recycling.
PROCEED TO ROUTING THE
SPEAKER CABLE (page 30)
Figure 20
1
2
3
Summary of Contents for FATHOM ICS-SYS-108
Page 1: ...Enclosure Installation Manual ICS SYS 108 ICS SYS 208...
Page 2: ......
Page 17: ...Page 17 Fathom ICS This page intentionally left blank...
Page 34: ...Fathom ICS Page 34 Notes...
Page 35: ...Page 35 Fathom ICS Notes...