background image

Intel

®

 Server System SR2612UR Service Guide

1

1

Server System Contents and 
References

Server System Contents

The Intel

® 

Server System SR2612UR ships with the Intel

®

 Server Board S5520UR. For 

information about the server board, see the 

Intel

®

 Server Board SR2612UR Technical 

Product Specification

.

The contents of the Intel

® 

Server System SR2612UR are listed in the following section.

Intel

®

 Server System SR2612UR Contents

Your Intel

®

 Server System SR2612UR ships with the following items:

Storage Application Array

Adjustable rackmount kit

Two plastic rack ear covers

Product CD

Attention Doc

Disk Drive Specifications

The Intel

®

 Server System SR2612UR supports up to 12 SAS and/or SATA disk drives.

Disk drives and two optional 2.5-inch fixed 3 Gbps SATA hard drives must meet these 
specifications and must be qualified for Intel

®

 Server System SR2612UR:

7200, 10,000, or 15,000 rpm

Hot-swap/hot-plug support

SATA or SAS device plug connector

3 Gb/sec (or 300 MB/sec) data rate for SAS and SATA, 1.5 Gb/sec data rate for 
SATA

3.5-inch form factor, 1-inch high

Cable Specifications

To connect your Intel

®

 Server System SR2612UR to a host using the dual integrated 1GE 

iSCSI ports, use high-quality Cat5e ethernet cables that meet these length requirements:

Summary of Contents for SR2612UR - Server System - 0 MB RAM

Page 1: ...tel Server System SR2612UR Service Guide i Intel Server System SR2612UR Service Guide A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies Products Intel Order Number E76206 004 ...

Page 2: ... may make changes to specifications and product descriptions at any time without notice Intel server boards contain a number of high density VLSI and power delivery components that need adequate airflow for cooling Intel s own chassis are designed and tested to meet the intended thermal requirements of these components when the fully integrated system is used together It is the responsibility of t...

Page 3: ...at you can use to manage one or more storage appliances in a variety of configurations the generic term storage system is used to refer to the controller disk drives JBOD expansion enclosures and servers being used together for data storage Many of the terms and concepts referred to in this guide are known to computer users by multiple names In this guide this terminology is used Controller also k...

Page 4: ...agrams for installing or replacing components such as the fans power supply drives and other components Chapter 4 describes the status and activity LEDs that help you monitor the overall status of your Intel Server System SR2612UR Chapter 5 provides instructions on using the utilities that are shipped with the board or that may be required to update the system This includes information for navigat...

Page 5: ... 0 CD oder unter http www intel com support motherboards server sb cs 010770 htm Consignes de sécurité Lisez attention toutes les consignes de sécurité et les mises en garde indiquées dans ce document avant de suivre toute instruction Consultez Intel Server Boards and Server Chassis Safety Information sur le Intel Server Deployment Toolkit 3 0 CD ou bien rendez vous sur le site http www intel com ...

Page 6: ... damage can result Electrostatic discharge ESD and ESD protection ESD can damage disk drives boards and other parts We recommend that you perform all the procedures in this chapter only at an ESD workstation If one is not available provide some ESD protection by wearing an antistatic wrist strap attached to chassis ground any unpainted metal surface on your server when handling parts ESD and handl...

Page 7: ...2 About the Disk Drives and Drive Carriers 3 Combining SATA and SAS Disk Drives 5 Additional Information and Software 7 Chapter 2 Server System Features 9 Server System Feature Overview 10 Server System Components 12 Intel Server System SR2612UR Components 14 Intel Light Guided Diagnostics 15 Server Board Components 18 Configuration Jumpers 21 Front of Intel Server System SR2612UR 22 Peripheral De...

Page 8: ...placement 45 Memory Installation 46 PCI Card and Battery Installation 48 Power Supply Replacement 51 Replacing the Backplane Board 51 Removing the Backplane Board 52 Installing and Removing the RAID Battery Backup Unit 54 Installing the RAID Battery Backup Unit BBU 54 Installing and Removing the Server Board 57 Removing the Server Board 57 Installing the Server Board 60 Replacing the Backup Batter...

Page 9: ...nce Class A Compliance 92 Product Ecology Compliance 93 Certifications Registrations Declarations 93 Product Regulatory Compliance Markings 95 Rack Mount Installation Guidelines 99 Power Cord Usage Guidelines 100 Electromagnetic Compatibility Notices 101 FCC Verification Statement USA 101 ICES 003 Canada 102 CE Declaration of Conformity Europe 102 VCCI Japan 102 BSMI Taiwan 103 KCC Korea 103 Regul...

Page 10: ...32 Français 133 Consignes de sécurité sur le serveur 133 Sécurité avertissements et mises en garde 133 Domaines d utilisation prévus 134 Sélection d un emplacement 134 Pratiques de manipulation de l équipement 134 Alimentation et avertissements en matière d électricité 135 Avertissements sur l accès au système 135 Décharges électrostatiques ESD 136 Autres risques 136 Español 137 Información de seg...

Page 11: ...iew 27 Figure 19 3 5 inch Hot Swap SAS SATA Backplane Components Rear View 27 Figure 20 Slider Mechanism 30 Figure 21 Securing the Front and Rear Portions of the Rail Kit 31 Figure 22 Tightening the Screws on the Rail s Slider Mechanism 31 Figure 23 Sliding the Appliance onto the Rails 32 Figure 24 Sliding the Disk Drive into the Drive Slot 33 Figure 25 Pushing the Lever Until It Meets the Latch o...

Page 12: ...the cable to PCI RAID Card 57 Figure 58 Disconnect the power cables 58 Figure 59 Disconnect the fan cables 58 Figure 60 Remove the screws 59 Figure 61 Installing the server board 60 Figure 62 Attach the screws 60 Figure 63 Installing power cables 61 Figure 64 Install the fan cables 61 Figure 65 Disconnect the power cables 63 Figure 66 Remove the screws 64 Figure 67 Remove cable chase 64 Figure 68 ...

Page 13: ...es Server System References 7 Intel Server System SR2612UR Feature Summary 10 Setup Menu Key Use 69 LED Decoder 85 LED Board LEDs Descriptions 86 LED Status for the Disk Drive 86 LED Status SAS SATA for the Disk Drive 87 Product Regulatory Compliance Markings 95 ...

Page 14: ...xiv Intel Server System SR2612UR Service Guide ...

Page 15: ...rackmount kit Two plastic rack ear covers Product CD Attention Doc Disk Drive Specifications The Intel Server System SR2612UR supports up to 12 SAS and or SATA disk drives Disk drives and two optional 2 5 inch fixed 3 Gbps SATA hard drives must meet these specifications and must be qualified for Intel Server System SR2612UR 7200 10 000 or 15 000 rpm Hot swap hot plug support SATA or SAS device plu...

Page 16: ...updated disk drive information or to purchase qualified disk drives or SAS cables contact your Intel sales representative Appliance Components and Features The main features of the appliance are shown in the following figures System Front View Figure 1 Intel Server System SR2612UR Front View ...

Page 17: ...r SASWT4I Please refer to the Intel Customer Support web site under the link for these RAID controllers at http www intel com support motherboards server About the Disk Drives and Drive Carriers The Intel Server System SR2612UR supports up to 12 SAS and or SATA disk drives SAS and SATA disk drives are not supported within the same appliance enclosure however only in specific configurations as show...

Page 18: ... empty drive slots or with empty drive carrier assemblies as this could cause damage to the LEDs on the midplane and or create thermal problems as well as void the Limited Warranty Disk drives are hot swappable Drive Slot Numbers Figure 4 Intel Server System SR2612UR Drive Slots Warning Disk drives spin at high speed When removing a Disk Drive Carrier from an enclosure with power on unlatch the ca...

Page 19: ...sure use the following figures to plan where you will place the disk drives These figures represent enclosures fully loaded with disk drives However the same guidelines apply even if you are filling some of the drive slots with blank drive carriers Recommended Disk Drive Configurations Figure 5 Intel Server System SR2612UR Drive Configurations ...

Page 20: ...6 Intel Server System SR2612UR Service Guide Unsupported Disk Drive Combinations Figure 6 Unsupported Disk Drive Combinations ...

Page 21: ... Available at http support intel com support server boards server s5520ur For basic BIOS settings and chipset information Intel Server Board S2612UR Technical Product Specification Available at http www intel com support motherboards server sr2612ur If you just received this product and you need to assemble your system and install components Intel Server System SR2612UR Quick Start User s Guide Pr...

Page 22: ...ers link on the left side of the web page To make sure your system falls within the allowed power budget Power Budget Analysis Tool Available at http www intel com support motherboards server sr2612ur For software to manage your Intel server Intel System Management Software Available at http www intel com go servermanagement Table 1 Server System References For this information or software Use thi...

Page 23: ...riefly describes the main features of the Intel Server System SR2612UR This includes illustrations of the products a list of the server system features and diagrams showing the location of important components and connections on the server systems Figure 7 Intel Server System SR2612UR ...

Page 24: ...r Support for one or two Intel Xeon Processor 5500 Series with a 4 8 GT s 5 86 GT s or 6 4 GT s Intel QPI link interface Support up to 95 W Thermal Design Power TDP processors having higher TDP are not supported This server board does not support previous generations of the Intel Xeon processors For a complete updated list of supported processors see http www intel com support motherboars server s...

Page 25: ...t 8 pin CPU power connectors One SSI compliant power supply SMBus connector Video On board Server Engines LLC Pilot II controller with Integrated 2D Video Controller 32 MB DDR2 Memory LAN Two 10 100 1000 ports provided by Intel 82575 PHYs Expansion Capabilities The following riser card options are available Three full height PCI Express slots passive Five full height PCI Express slots active Hard ...

Page 26: ...rive Activity Hard Drive Status Intel Light Guided diagnostics Fan Fault DIMM Fault CPU Fault 5V Standby System Status System Identification POST Code Diagnostics Power Supply Up to two 760 W power supply modules Fans Non redundant fan option containing four system fans Non redundant fan in each power supply module System Management On board ServerEngines LLC Pilot II Controller Integrated Baseboa...

Page 27: ...Intel Server System SR2612UR Service Guide 13 Figure 8 Intel Server System SR2612UR Configuration Diagram ...

Page 28: ...rd H Fan Module C PCI Riser Assembly I 2 5 inch System Drives D Server Board J RAID Card Battery Optional E Backplane PCB K CD DVD Drive Optional F Hard Drive Assembly A POWER SUPPLY B POWER DIST BOARD C PCI RISER ASSY D SERVER BOARD E BACKPLANE PCB F HARD DRIVE ASSY G SYSTEM AIR DUCT H FAN MODULE I 2 5 SYSTEM DRIVES J RAID CARD BATTERY K CD DVD DRIVE I F A C D E G H B J K OPTIONAL HARDWARE ...

Page 29: ...vices Subsystem fault LED on the front and back panels See Figure 11 and Figure 12 shows health of the enclosure service subsystem off amber The System Status LED on the front and back panels see Figure 11 and Figure 12 shows the overall health of the system green blinking green blinking amber amber off The System Identification LED on the front and back panel see Figure 11 and Figure 12 helps ide...

Page 30: ...ostic LEDs Server Board AF002833 I J G H J F D A B E C A POST Code Diagnostic LEDs B System Identification LED C Status LED D Memory 1 Fan Fault LED E CPU 1 Fan Fault LED F CPU 1 DIMM Fault LEDs G CPU 2 Fan Fault LED H Memory 2 Fan Fault LED I CPU 2 DIMM Fault LEDs J 5V Standby LED ...

Page 31: ...Intel Server System SR2612UR Service Guide 17 Figure 11 Intel Light Guided Diagnostic LEDs Standard Control Panel ...

Page 32: ...d Item Function Color State Description A Standby Power OK LED 3 3V Green Off AC Power Off On AC power on or DC power on B System Status LED Green Solid On System booted and ready Blink Degraded C System Status LED Amber Blink Non critical Solid On Critical non recoverable D System Identification LED Blue On Identify active through command Off No Identification E Power Switch N A N A N A ...

Page 33: ...Intel Server System SR2612UR Service Guide 19 AF002696 E B C F G D A EE DD CC BB AA Z Y V W X U T J H I K L M N S R O P Q ...

Page 34: ...slots K Processor 2 DIMM slots L Processor 2 Socket M CPU 2 Fan Header N Memory 2 Fan Header O Bridge Board Connector Intel Server Chassis P Front Panel Connector Q Fan Board Connector R 2x4 Power Connector S Main Power Connector T Power Supply SMBus Connector U System 2 Fan Header V USB Header W Low profile USB Solid State Drive Header X System 1 Fan Header Y LCP IPMB Header Z SATA RAID 5 Key Hea...

Page 35: ...tion C BIOS Default J1E7 If pins 2 3 are jumpered the BIOS settings are cleared on the next reset These pins should be jumpered on 1 2 for normal operation D Password Clear J1E8 If pins 2 3 are jumpered administrator and user passwords are cleared within five to ten seconds after the system is powered on These pins should be jumpered on 1 2 for normal system operation AF002832 J1D4 BIOS Recover 2 ...

Page 36: ...or installing hard drives CD ROM drive or DVD ROM drive The drives must be purchased separately The following figure shows the available options E BIOS Recover J1D4 If pins 2 3 are jumpered the system can only boot from EFI bootable recovery media with the recovery BIOS image The main system BIOS will not boot These pins should be jumpered on 1 2 for normal system operation Jumper Name Jumper Purp...

Page 37: ... Peripherals Hard Disk Drive Carriers The server system ships with 12 drive carriers for installing 12 SAS or Serial ATA SATA hot swap drives A Hot Swap 3 5 inch Hard Drive Bays 12 B Internal fixed 2 5 inch SATA Hard Drive Bays 2 C Slimline SATA Optical Drive Bay 1 ...

Page 38: ...d with your server system the optical drive must be purchased separately The drive inside the chassis is NOT hot swappable The system power must be turned off to insert or remove the slimline optical drive carrier To use one of the drives provided by Intel use the following order codes Slimline DVD ROM Drive AXXSATADVDROM Slimline DVD RW Drive AXXSATADVDRWROM Note The Intel Server System SR2612UR ...

Page 39: ...n Off AC Power Off On AC power on or DC power on B System Status LED Green Solid On System booted and ready Blink Degraded C System Status LED Amber Blink Non critical Solid On Critical non recoverable D System Identification LED Blue On Identify active through command Off No Identification E Power Switch N A N A N A ...

Page 40: ...plane and control panel Only one midplane is offered for this system Active SAS midplane Note SATA connectors 6 and 7 are not used in the Intel Server System SR2612UR Active Midplane The following diagram show the location for each connector found on the active midplane Figure 17 Active SAS Midplane Components A SAS Connector B Backplane Connector ...

Page 41: ...There are no hard drive cables that connect to the backplane All hard drive control signals are routed from the midplane board which plugs directly into the backplane Figure 18 3 5 inch Hot Swap SAS SATA Backplane Components Front View Figure 19 3 5 inch Hot Swap SAS SATA Backplane Components Rear View A SAS SATA Hard Disk Drive Connectors A Backplane Power Connector C Midplane Board Connector B S...

Page 42: ... and USB Media Redirection allowing USB devices attached to the remote system to be used on the managed server Rack Mount Options Your Intel Server System SR2612UR can be mounted into a rack Intel provides the following option to mount this server system into a rack A basic slide rail kit designed to mount the system into a standard 19 inches by up to 34 inches deep EIA 310D compatible server cabi...

Page 43: ...he reader is facing the front of the server system as it would be positioned for normal operation Preparing for Installation 1 Carefully read Safety Information on page v at the beginning of this manual 2 Remove all the components from the packaging inspect them for shipping damage then place them on an antistatic surface until you are ready to use them If you are using new disk drives allow them ...

Page 44: ... rail assembly One left rail assembly Ten 10 32 cage nuts square hole cabinets Ten 10 32 speed nuts round hole cabinets Ten 10 32 x 0 50 Phillips pan head screws 2 Ensure the four screws contained within the slider mechanism are loosened Figure 20 Slider Mechanism 3 Slide the front and rear portions of the rail away from each other until the length is correct for your cabinet Secure the front and ...

Page 45: ... Front and Rear Portions of the Rail Kit 4 Tighten the four screws on each rail s slider mechanism Figure 22 Tightening the Screws on the Rail s Slider Mechanism Caution A fully loaded appliance is heavy To avoid personal injury have someone help you lift the appliance ...

Page 46: ... ears are flush against the vertical supports and the appliance rests completely on the rails Figure 23 Sliding the Appliance onto the Rails 6 Secure both rackmount ears to the vertical supports using two of the 10 32 x 50 inch screws and carefully snap the plastic rack ear covers in place as shown The rack installation is complete ...

Page 47: ... or plastic blank into a carrier refer to Drive Installation in the Drive Carrier on page 75 in this manual 1 Select an open drive slot 2 Hold the disk drive so the LEDs are on the left and the lever is fully open 3 Slide the disk drive into the drive slot until the lever starts to close Figure 24 Sliding the Disk Drive into the Drive Slot 4 Push the lever until it meets the latch on the left side...

Page 48: ... from right to left in the enclosure Note To maintain proper airflow and cooling you must install a disk drive carrier populated with an actual disk drive or plastic drive blank assembly in every slot of the enclosure Under no circumstances should the appliance be operated with empty drive slots or with empty drive carrier assemblies as this could cause damage to the LEDs on the backplane and or c...

Page 49: ...w and cooling inside the enclosure install either a populated disk drive carrier or a plastic drive blank assembly into the empty drive slot as quickly as possible If you will be installing a replacement drive carrier populated with a new disk drive allow it to acclimate to room temperature before continuing Removing a Disk Drive Warning Disk drives spin at high speed When removing a Disk Drive Ca...

Page 50: ...own wait approximately 15 20 seconds Warning Removing a populated disk drive carrier before it has fully spun down may result in disk drive damage and possible personal injury 4 Gently pull the disk drive carrier or drive blank out of the enclosure 5 Immediately replace the disk drive carrier assembly or install a drive blank assembly to maintain correct airflow and cooling For more information on...

Page 51: ...the power cords to the rear of the unit 2 Connect a monitor keyboard and mouse to the rear connections on the enclosure 3 Turn on power to the enclosure by pressing the power button on the rear of the enclosure 4 Insert the operating system CD DVD 5 Follow the instructions for installing the operating system 6 If you want to install additional drivers or programs for the PCI cards or other devices...

Page 52: ...gure 28 Establishing a Connection to the LAN Data Port If you are not connecting additional enclosures continue with Powering On on page 38 Connecting Additional Enclosures You can expand your configuration with storage enclosures depending on the number of drives supported by the SAS or SATA HBA You can include enclosures installed with SAS disk drives and enclosures installed with SATA disk driv...

Page 53: ... begin using your Intel Server System SR2612UR Installing a 2 5 inch Internal Drive The Intel Server System SR2612UR supports up to two 2 internal 2 5 inch SATA drives They are connected directly to the CPU server board and provide the capability to run the operating system from these drives Complete the following steps to install one or more 2 5 inch internal drives in the Intel Server System SR2...

Page 54: ... using the 4 screws provided with the drive If installing only one drive locate the drive on the bottom shelf of the sled Figure 31 Installing the boot drives 7 Reinstall the drive sled and tighten down the captive thumbscrew 8 The power cables for the 2 5 inch drives are located near the drive sled Attach the cable s to the drive s 9 Carefully remove the CPU server board air duct ...

Page 55: ...tel Server System SR2612UR supports an optional DVD Complete the following steps to install a DVD drive in the Intel Server System SR2612UR 1 Ensure the AC power cord s are disconnected from the enclosure 2 Remove the top cover from the enclosure by loosening the captive screw with a Phillips screwdriver on the right rear of the enclosure 3 Slide the top cover back and lift it from the enclosure 4...

Page 56: ... enclosure locate the DVD tray screw and remove This screw will be re used Figure 34 Removing the four screws and cover plate 7 Slide the DVD tray out of the enclosure 8 Position the DVD unit as shown in the following figure and carefully snap the unit in place by aligning the pointed tabs with the screw holes on the DVD unit ...

Page 57: ...the enclosure and the SATA end of slimline cable to the CPU server board If 2 5 inch drives are installed connect the SATA cable to the SATA2 connector Figure 36 Routing the Cable From the DVD Unit to the Server Board 11 Reinstall the top cover and tighten the captive screw 12 Reinstall the power cord s Replacing a Fan You should replace a defective fan as soon as possible to maintain proper cooli...

Page 58: ...op of the fan towards the rear of the enclosure until the fan pops free Figure 37 Removing the Defective Fan 6 Carefully disconnect the 4 wire connector from the PCB note the wire routing and remove the defective fan from the enclosure Installing a Fan Installing a fan is the opposite of Replacing a Fan on page 43 1 Carefully connect the 4 wire connector onto the pc board Route the wires so that t...

Page 59: ...y loosening the captive screw with a Phillips screwdriver on the right rear of the enclosure 3 Slide the top cover back and lift it from the enclosure 4 Locate the midplane located between the backplane and fans Figure 38 Midplane 5 Disconnect the I O cable by depressing the release tab and pulling the cable upward Caution You must depress the I O SAS cable release tab when removing the cable to p...

Page 60: ...server board supports up to 12 DDR3 DIMMs six per processor The maximum memory capacity is 96 GB Note The memory slots associated with a particular processor are unavailable if the given processor socket is not populated with a CPU chip Memory recommendations 1 It is recommended that the same type size and manufacturer of DIMM module be used throughout the enclosure Using different memory vendors ...

Page 61: ...following order Slot A1 Slot B1 Slot C1 CPU 1 Slot D1 Slot E1 Slot F1 CPU 2 Once the above slots are full then Slot A2 Slot B2 Slot C2 CPU1 Slot D2 Slot E2 Slot F2 CPU2 Figure 40 Memory Slots on the Server Board Note You can populate memory in any order only if the CPU server board is running in Channel Independent Mode Please reference the CPU server board functional specification if the enclosur...

Page 62: ...ion cards A typical configuration uses a PCI E based RAID card to communicate with the 12 drive slots Complete the following steps to install a PCI E card in the Intel Server System SR2612UR 1 Ensure the AC power cord s are disconnected from the enclosure 2 Remove the top cover from the enclosure by loosening the captive screw with a Phillips screwdriver on the right rear of the enclosure 3 Slide ...

Page 63: ...lled backwards 8 To reinstall the PCI cage assembly line up the tabs at the bulkhead cutouts on the rear of the enclosure 9 Carefully lower the assembly and align the PCI cage circuit card with the CPU server board connector Press into place 10 Tighten the two 2 captive screws on the PCI card cage assembly 11 Depending on the type of card installed there may be cables that have to be routed In the...

Page 64: ...upplied mounting screws in the location indicated in the following figure Figure 44 Mounting an External Battery 13 Reinstall the top cover and tighten the captive screw A POWER SUPPLY B POWER DIST BOARD C PCI RISER ASSY D SERVER BOARD E BACKPLANE PCB F HARD DRIVE ASSY G SYSTEM AIR DUCT H FAN MODULE I 2 5 SYSTEM DRIVES J RAID CARD BATTERY K CD DVD DRIVE I F A C D E G H B J K OPTIONAL HARDWARE ...

Page 65: ...ips screwdriver 3 Slide the top cover back and lift it from the enclosure 4 Remove the power supply by pushing in and holding the green latch in the directions shown in the following figure Figure 45 Removing the Power Supply 5 Using the handle carefully slide the power supply out of the enclosure chassis 6 Reinstall a new power supply by inserting it into the chassis enclosure until it clicks int...

Page 66: ...he top cover from the enclosure by loosening the captive screw with a Phillips screwdriver on the right rear of the enclosure 4 Slide the top cover back and lift it from the enclosure 5 Remove the main power connector from the backplane as shown in Figure 46 Figure 46 Removing the Main Power Connector from the Backplane 6 Remove the logic cable connector from the backplane as shown in Figure 47 Fi...

Page 67: ...s head screwdriver reach in from the front of the enclosure and remove the seven 7 screws attaching the backplane Figure 49 Removing the Screws that Attach the Backplane 9 Carefully pull back on the top of the backplane and lift it out of the enclosure Figure 50 Pulling Back the Backplane and Lifting It Out of the Enclosure ...

Page 68: ...ded ESD mat to place drives and components on To install the RAID battery backup unit follow these steps 1 Power down the enclosure and remove the power cord s 2 Remove all disk drives Note their slot location in the enclosure 3 Remove the top cover from the enclosure by loosening the captive screw with a Phillips screwdriver on the right rear of the enclosure 4 Slide the top cover back and lift i...

Page 69: ...hown below Figure 52 Remove the standoff 7 Align the battery pack as shown with cable installed and put into place by inserting the plastic tabs into the slots and sliding the pack in the direction of the arrow on the battery plate until the unit snaps into place Figure 53 Align the battery pack ...

Page 70: ... Service Guide Figure 54 Aligning the battery pack 8 Replace and tighten the standoff that was removed in step 6 Figure 55 Replace and tighten standoff 9 Route the cable from the battery pack as shown below Figure 56 Route the cable ...

Page 71: ...erver Board To remove the server board follow these steps 1 Power down the enclosure and remove the power cord s 2 Remove the top cover from the enclosure by loosening the captive screw with a Phillips screwdriver on the right rear of the enclosure 3 Slide the top cover back and lift it from the enclosure 4 Remove the processor air duct 5 Remove the PCI riser assembly 6 Remove the Intel RMM3 if in...

Page 72: ...onnect fan cables FAN 1 FAN 2 FAN 3 and FAN 4 from Motherboard as shown below Figure 59 Disconnect the fan cables 9 Remove memory 10 Remove the processor heatsink s and processor s 11 Remove the nine screws from the server board and lift the server board from the server system as shown below ...

Page 73: ...Intel Server System SR2612UR Service Guide 59 Figure 60 Remove the screws 12 Install the replacement server board ...

Page 74: ...ing the board and inserting the connectors into the proper openings on the rear bulkhead as shown below When the connectors are placed into the proper openings slowly place the board into the chassis without causing any damage to the bottom side components Figure 61 Installing the server board 2 Attach the server board with nine screws Figure 62 Attach the screws ...

Page 75: ...4 Install fan cables FAN 1 FAN 2 FAN 3 and FAN 4 into Motherboard as shown below Figure 64 Install the fan cables 5 Install memory 6 Install the processor s 7 Install processor heatsink s 8 If necessary install the Intel RMM3 9 Install the PCI riser assembly 10 Install the processor air duct 11 Install the top cover and tighten the captive screw 12 Install the power cords ...

Page 76: ...ratfabrikanten Brukt batteri returneres apparatleverandøren Varning Explosionsfara vid felaktigt batteribyte Använd samma batterityp eller en ekvivalent typ som rekommenderas av apparattillverkaren Kassera använt batteri enligt fabrikantens instruktion Varoitus Paristo voi räjähtää jos se on virheellisesti asennettu Vaihda paristo ainoastaan laitevalmistajan suosittelemaan tyyppiin Hävitä käytetty...

Page 77: ...d remove the power cord s 2 Remove the top cover from the enclosure by loosening the captive screw with a Phillips screwdriver on the right rear of the enclosure 3 Slide the top cover back and lift it from the enclosure 4 Remove the processor air duct 5 Remove the PCI riser assembly 6 Disconnect power cables P1 P2 P3 and Front Panel logic cable from Motherboard as shown below Figure 65 Disconnect ...

Page 78: ...rom nylon clamps and disconnect power cable P4 from backplane as shown below Figure 66 Remove the screws 8 Remove cable chase insert foam from cable chase fan blank and then remove power cable p4 from cable chase fan blank as shown below Figure 67 Remove cable chase ...

Page 79: ...m as shown below Figure 68 Remove the four screws from the PDB 10 Install the replacement power distribution module Installing Power Distribution Module 1 Install power distribution module onto spacers and Install all four screws as shown below Figure 69 Installing the Power Distribution Module 2 Route cable marked P4 through the cable chase fan blank as shown below ...

Page 80: ...de Figure 70 Route cable P4 3 Install 2 nylon clamps onto cable P4 flat side up as shown below Figure 71 Install the nylon clamps 4 Connect power cable P4 into backplane and Install 2 screws into nylon clamps and secure to chassis as shown below ...

Page 81: ...Server System SR2612UR Service Guide 67 Figure 72 Connecting cable P4 to backplane 5 Insert cable chase insert foam into cable chase fan blank See picture below for foam orientation Figure 73 Foam orientation ...

Page 82: ...er cables P1 P2 P3 and Front Panel logic cable into Motherboard as shown below Figure 74 Install the power cables 7 Install the PCI riser assembly 8 Install the processor air duct 9 Install the top cover and tighten the captive screw 10 Install the power cords ...

Page 83: ...T after POST completes the memory test Press F2 to enter SETUP When the BIOS setup is entered the Main screen is displayed If You Cannot Access Setup If you are not able to access the BIOS Setup you might need to restore the BIOS default settings For instructions see Restoring the BIOS Defaults on page 74 Setup Menus Each BIOS Setup menu page contains a number of features Except for those features...

Page 84: ...ther keyboard but it has the same effect Enter Execute Command The Enter key is used to activate submenus when the selected feature is a submenu or to display a pick list if a selected feature has a value field or to select a sub field for multi valued features like time and date If a pick list is displayed the Enter key selects the currently highlighted item undoes the pick list and allows anothe...

Page 85: ...he BIOS update process a recovery process may need to be followed to return the system to service See Additional Information and Software on page 7 for a web link to necessary software and instructions Recording the Current BIOS Settings 1 Boot the computer and press F2 when you see the message Press F2 Key if you want to run SETUP 2 Write down the current settings in the BIOS Setup program F10 Sa...

Page 86: ...IOS update process is completed Note You may encounter a CMOS Checksum error or other problem after reboot If this happens shut down the system and boot it again CMOS checksum errors require that you enter Setup load BIOS defaults check your settings save your settings and exit Setup Clearing the Password If the user or administrator password s is lost or forgotten moving the password clear jumper...

Page 87: ...Intel Server System SR2612UR Service Guide 73 The password is now cleared and can be reset by going into the BIOS setup ...

Page 88: ...he system cover see Removing the System Cover on page 48 3 Locate the BIOS Default jumper block at board position J1E7 4 Move the jumper from the normal operation position covering pins 1 and 2 to the Set Default position covering pins 2 and 3 5 Wait five seconds 6 Return the BIOS Default jumper to the normal position covering pins 1 and 2 7 Close the server system 8 Power up the system The BIOS d...

Page 89: ...rsal drive carrier Caution Acclimate new disk drives to room temperature for at least two hours prior to use Caution Be sure to take antistatic precautions when handling disk drives Use an anti static wrist strap with grounding wire as a minimum precaution Installing a Disk Drive in a Universal Drive Carrier Perform the following steps to install a disk drive into the universal drive carrier 1 Rem...

Page 90: ...cer depending on whether you will use blanks at a later time in the enclosure 4 Position the disk drive with the connector towards the rear of the carrier and the disk drive label on top per the illustration below There are two sets of mounting holes on the carrier Use the four holes that position the connector farthest back on the carrier This will ensure the drive will make good connection with ...

Page 91: ...ported and do not require a mux This feature is not supported on the storage application array but is used on other enclosures Installing a Blank Insert in a Universal Drive Carrier A drive blank insert plastic spacer is used on a drive carrier when no disk drive is installed The plastic insert is required to maintain structural integrity of the universal carrier when used as a blank drive in the ...

Page 92: ...Intel Server System SR2612UR Service Guide Figure 77 Orienting the Plastic Insert with the Drive Carrier 2 Carefully install the four 4 6 x 32 x 25 inch screws supplied with the carrier Do not overtighten ...

Page 93: ... Example SC5400 If third party chassis used indicate make and model Baseboard Information some information maybe found by accessing BIOS going through the Server Management menu System Information Baseboard PBA TA AA Example 123456 789 can be found on the white sticker label on the baseboard System BIOS Version Intel Remote Management Module Firmware Version if applicable Intel Management Module B...

Page 94: ...mware been tried Yes No Has the latest FRU SDR been tried Yes No Has the latest HSC been tried Yes No Processor information Thermal solution Heatsink examples 1U Passive w air ducting Active w fan etc Memory Type Speed sSpec Thermal Solution Processor 1 Processor 2 Processor 3 Processor 4 Manufacturer Part Number DRAM Part Number On Intel tested list ...

Page 95: ...Storage Devices Example SCSI SATA SAS USB Tape etc Operating System Information Example RedHat Enterprise Linux Microsoft Windows Server 2003 Service pack 1 OEM CD Manufacturer Version Language version English Arabic Chinese Simplified Service Pack Level or Kernel Revision Distribution OEM Retail Type Slot Manufacturer Model Firmware Description Use Manufacturer Model Firmware Manufacturer Model T...

Page 96: ...troller firmware version Has the latest RAID firmware been tried Yes No RAID driver version Has the latest RAID driver been tried Yes No RAID volumes configuration disks RAID level RAID volume use Boot device Data Volume Is BBU Battery Backup Unit installed Yes No BBU part number Detailed description of issue Troubleshooting tried ...

Page 97: ... please provide a brief description below Do you have systems already purchased that are not being delivered to your customers because of this issue If yes please provide a brief description below Have you returned systems or components to your place of purchase because of this issue If yes please provide a brief description below All other brands and names are property of their respective owners ...

Page 98: ...84 Intel Server System SR2612UR Service Guide ...

Page 99: ...each LED indicates When a failure occurs within the system the System Fault LED illuminates LED Status Board The LED board is located at the rear of the enclosure above the power supply modules The following image shows the LED board Table 4 LED Decoder LED Descriptor Color Description 1 System power good Green System power OK 2 System fault Amber System fault detected 3 server board fault Amber s...

Page 100: ...ee LEDs that indicate the status of the disk drive as described in the following table Figure 80 Disk Drive LEDs Table 5 LED Board LEDs Descriptions LED Color Description Standby Power OK Green Indicates the power is okay System Status LED Green Green System Status LED Amber Amber System Identify Blue Enclosure ID Table 6 LED Status for the Disk Drive LED Condition Color 1 Not Used ...

Page 101: ...n constantly Fault Repeating cycle of Amber for 250 milliseconds Off for 250 milliseconds Predicted Fail Repeating cycle of Amber for 500 milliseconds Green for 500 milliseconds Reserved Device Repeating cycle of Amber for 500 milliseconds Green for 500 milliseconds Green on constantly with Midplane firmware 105 or later Hot Spare Repeating cycle of Amber for 500 milliseconds Green for 500 millise...

Page 102: ...88 Intel Server System SR2612UR Service Guide ...

Page 103: ...owledgebase to search for product information throughout the support site 2 If you are still unable to obtain a solution to your issue send an email to Intel s technical support center using the online form available at http supportmail intel com scripts emf welcome aspx 3 Lastly you can contact an Intel support representative using one of the support phone numbers available at http support intel ...

Page 104: ...90 Intel Server System SR2612UR Service Guide ...

Page 105: ...ion please contact your local Intel representative This is an FCC Class A device Integration of it into a Class B system does not result in a Class B device Product Regulatory Compliance This server chassis product when correctly integrated per this guide complies with the following safety and electromagnetic compatibility EMC regulations Intended Application This product was evaluated as Informat...

Page 106: ...a BSMI RPC Certification Taiwan Product EMC Compliance Class A Compliance FCC Part 15 Emissions USA Verification ICES 003 Canada CISPR 22 Emissions International EN55022 Emissions Europe EN55024 Immunity Europe EN61000 3 2 Harmonics Europe EN61000 3 3 Voltage Flicker Europe CE EMC Directive 2004 108 EC Europe VCCI Emissions Japan AS NZS CISPR 22 Emissions Australia New Zealand BSMI CNS13438 Emissi...

Page 107: ...ay apply See www dtsc ca gov hazardouswaste perchlorate This notice is required by California Code of Regulations Title 22 Division 4 5 Chapter 33 Best Management Practices for Perchlorate Materials This product part includes a battery which contains Perchlorate material China RoHS MII Measure 39 Product marked with the Environmental Friendly Usage Period EFUP label of 20yrs substance table in Sim...

Page 108: ...tel Server System SR2612UR Service Guide KCC Certification Korea IRAM Certification Argentina Ecology Declaration International China RoHS Environmental Friendly Use Period Packaging Product Recycling Marks ...

Page 109: ... and safety markings In the event there is no room for a marking s on the chassis the information is provided here in this guide Table 8 Product Regulatory Compliance Markings Regulatory Compliance Country Marking cETLus Listing Marks USA Canada GS Mark Germany CE Mark Europe IRAM Mark Argentina Ctick Mark Australia NZ N232 Country of Origin Mark Made in China ...

Page 110: ...s A Canada CANADA ICES 003 CLASS A VCCI Marking Class A Japan BSMI Certification Number Class A Warning Taiwan GOST R Marking Russia MO04 KCC Mark Korean Communications Commission Korea 인증번호 CPU SR2612 A Table 8 Product Regulatory Compliance Markings Regulatory Compliance Country Marking ...

Page 111: ...onal Battery Perchlorate Warning Information California Perchlorate Material Special handling may apply See www dtsc ca gov hazardouswaste perchlorate This notice is required by California Code of Regulations Title 22 Division 4 5 and Chapter 33 Best Management Practices for Perchlorate Materials This product may include a battery which contains Perchlorate material Table 8 Product Regulatory Comp...

Page 112: ...ein Stromkabel Um eine Gefahr des elektrischen Schlages zu verringern trennen sie beide 2 Stromkabeln bevor Instandhaltung Nordic Ground Marking Connection to Proper Ground Outlet WARNING Apparaten skall anslutas till jordat uttag när den ansluts till ett nätverk Laite on liitettävä suojamaadoituskoskettimilla varustettuun pistorasiaan Connect only to a properly earth grounded outlet Safety Stand ...

Page 113: ...en you are responsible for installing an AC power disconnect for the entire rack unit This main disconnect must be readily accessible and it must be labeled as controlling power to the entire rack not just to the server s Grounding the rack installation To avoid the potential for an electrical shock hazard you must include a third wire safety ground conductor with the rack installation If the serv...

Page 114: ...ing between the DC source and the server The branch circuit protection shall be rated minimum 75Vdc 10 A maximum per feed pair If the DC power system for the equipment rack is installed with more than 10 amperes of protection you must provide supplemental protection for the server Power Cord Usage Guidelines Warning Do not attempt to modify or use an AC power cord set that is not the exact type re...

Page 115: ... not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and the receiver Connect the ...

Page 116: ...ent standard entitled Digital Apparatus ICES 003 of the Canadian Department of Communications CE Declaration of Conformity Europe This product has been tested in accordance to and complies with the Low Voltage Directive 73 23 EEC and EMC Directive 89 336 EEC The product has been marked with the CE Mark to illustrate its compliance VCCI Japan English translation of the preceding notice This is a Cl...

Page 117: ...ipient Intel Corporation 4 Date of Manufacturer Refer to date code on product 5 Manufacturer Nation Intel Corporation Refer to country of origin marked on product Regulated Specified Components To maintain the UL listing and compliance to other regulatory certifications and or declarations the following regulated components must be used and conditions adhered to Interchanging or use of other compo...

Page 118: ... 1 Add in boards containing external power connectors and or lithium batteries must be UL recognized or UL listed Any add in board containing modem telecommunication circuitry must be UL listed In addition the modem must have the appropriate telecommunications safety and EMC approvals for the region in which it is sold Peripheral Storage Devices must be UL recognized or UL listed accessory and TUV...

Page 119: ...d s is considered the disconnect device to the main AC power The socket outlet that the system plugs into shall be installed near the equipment and shall be easily accessible SAFETY STEPS Whenever you remove the chassis covers to access the inside of the system follow these steps 1 Turn off all peripheral devices connected to the system 2 Turn off the system by pressing the power button 3 Unplug a...

Page 120: ...the system 2 Check that cables add in boards and other components are properly installed 3 Attach the covers to the chassis with the screws removed earlier and tighten them firmly 4 Insert and lock the padlock to the system to prevent unauthorized access inside the system 5 Connect all external cables and the AC power cord s to the system A microprocessor and heat sink may be hot if the system has...

Page 121: ...ded with a properly grounded wall outlet Provided with sufficient space to access the power supply cord s because they serve as the product s main power disconnect Benutzer können am Netzgerät dieses Produkts keine Reparaturen vornehmen Das Produkt enthält möglicherweise mehrere Netzgeräte Wartungsarbeiten müssen von qualifizierten Technikern ausgeführt werden Versuchen Sie nicht das mitgelieferte...

Page 122: ...omanschlußstecker Ihres Systems aus der Steckdose 4 Auf der Rückseite des Systems beschriften und ziehen Sie alle Anschlußkabel von den I O Anschlüssen oder Ports ab 5 Tragen Sie ein geerdetes Antistatik Gelenkband um elektrostatische Ladungen ESD über blanke Metallstellen bei der Handhabung der Komponenten zu vermeiden 6 Schalten Sie das System niemals ohne ordnungsgemäß montiertes Gehäuse ein Zu...

Page 123: ...er und staubfrei sein Hausstaub ausgenommen gut gelüftet und keinen Heizquellen ausgesetzt sein einschließlich direkter Sonneneinstrahlung keinen Erschütterungen ausgesetzt sein keine starken von elektrischen Geräten erzeugten elektromagnetischen Felder aufweisen in Regionen in denen elektrische Stürme auftreten mit einem Überspannungsschutzgerät verbunden sein während eines elektrischen Sturms so...

Page 124: ...système 2 Mettez le système hors tension en mettant l interrupteur général en position OFF bouton poussoir 3 Débranchez tous les cordons d alimentation c a du système et des prises murales 4 Identifiez et débranchez tous les câbles reliés aux connecteurs d E S ou aux accès derrière le système 5 Pour prévenir les décharges électrostatiques lorsque vous touchez aux composants portez une bande antist...

Page 125: ...broches aiguës des cartes et aux bords tranchants du capot Nous vous recommandons l usage de gants de protection Danger d explosion si la batterie n est pas remontée correctement Remplacer uniquement avec une batterie du même type ou d un type équivalent recommandé par le fabricant Disposez des piles usées selon les instructions du fabricant Le système a été conçu pour fonctionner dans un cadre de...

Page 126: ...rá desenchufar todos los cables de corriente alterna de la pared o desconectar la fuente de alimentación INSTRUCCIONES DE SEGURIDAD Cuando extraiga la tapa del chasis para acceder al interior del sistema siga las siguientes instrucciones 1 Apague todos los dispositivos periféricos conectados al sistema 2 Apague el sistema presionando el interruptor encendido apagado 3 Desconecte todos los cables d...

Page 127: ...ables las placas adicionales y otros componentes se hayan instalado correctamente 3 Incorpore las tapas al chasis mediante los tornillos extraídos anteriormente tensándolos firmemente 4 Inserte el bloqueo de seguridad en el sistema y bloquéelo para impedir que pueda accederse al mismo sin autorización 5 Conecte todos los cables externos y los cables de alimentación CA al sistema Si el sistema ha e...

Page 128: ...ntes de vibración Aislado de campos electromagnéticos fuertes producidos por dispositivos eléctricos En regiones con frecuentes tormentas eléctricas se recomienda conectar su sistema a un eliminador de sobrevoltage y desconectar el módem de las líneas de telecomunicación durante las tormentas Provisto de una toma de tierra correctamente instalada Provisto de espacio suficiente como para acceder a ...

Page 129: ...ere all interno del sistema seguire i seguenti passi 1 Spegnere tutti i dispositivi periferici collegati al sistema 2 Spegnere il sistema usando il pulsante spento acceso dell interruttore del sistema 3 Togliere tutte le spine dei cavi del sistema dalle prese elettriche 4 Identificare e sconnettere tutti i cavi attaccati ai collegamenti I O od alle prese installate sul retro del sistema 5 Qualora ...

Page 130: ... Fare attenzione alla presenza di piedini appuntiti e parti taglienti sulle schede e sul telaio È consigliabile l uso di guanti di protezione Esiste il pericolo di un esplosione se la pila non viene sostituita in modo corretto Utilizzare solo pile uguali o di tipo equivalente a quelle consigliate dal produttore Per disfarsi delle pile usate seguire le istruzioni del produttore Il sistema è progett...

Page 131: ... RS232 COM 1Gb Ethernet 2 VGA monitor and USB 4 Host Expansion Interfaces Integrated Dual 1Gb Ethernet 10 Gb Ethernet Fibre Channel SAS selectable through PCI card SAS ports for expansion connections on PCI card Up to 1200 MB s throughput bandwidth application dependant Measured Performance Up to 750 MB s sustained reads Capacity Up to 12 drives or 24 TB capacity per 2U enclosure using available 2...

Page 132: ...ocol support Redundant cable support 2U Rackmount Enclosure Dimensions 3 5 inches H x 17 6 inches W x 31 inches D 8 9 cm H x 44 7 cm W x 78 7 cm D Weight with drives 70 lbs 35 kg max Standard Rackmount Rail Kit Adjustable Depth 28 0 inches to 34 0 inches 71 1 cm to 86 4 cm Disk Drives 12 independent 300MB s point to point connections to each SAS or SATA disk drive Common universal dual purpose dri...

Page 133: ...rds Up to two 2 5 inch internal SATA drives Operating Environment Temperature 0 to 35 C Temperature gradient 20 C per hour Relative humidity 10 to 80 percent non condensing Humidity gradient 10 per hour Altitude 200 to 10 000 ft Shock 5G at 11ms 1 2 sine wave pulse Vibration 0 15G at 5Hz to 400Hz Acoustics 7 Bels at normal operation tested to ISO7779 Non Operating Environment Temperature 40 to 70 ...

Page 134: ...N61000 Class A FCC Class A Canadian IECS 003 VCCI Class A Safety Standards UL 60950 CSA 22 2 950 IEC 60950 EN 60950 Quality Standards Manufactured under an ISO 9002 registered quality system Environmental Protection RoHS and WEEE compliant Failure Notifications SCSI Enclosure Services SES 2 over I2C physical interface LEDs audible alarms field replaceable unit FRU revision and serial number report...

Page 135: ...modules fan speed control disk drives and I O module s as well as error rates and quality of service Qualifications For Newisys qualifications relative to supported options for specific disk drives software application environments PCI adapters and so on go to www newisys com support ...

Page 136: ...122 Intel Server System SR2612UR Service Guide ...

Page 137: ...duct certifications and approvals Use only the described regulated components specified in this guide Use of other products components will void the UL Listing and other regulatory approvals of the product and may result in noncompliance with product regulations in the region s in which the product is sold Safety Warnings and Cautions To avoid personal injury or property damage before you begin in...

Page 138: ...ng direct sunlight and radiators Away from sources of vibration or physical shock Isolated from strong electromagnetic fields produced by electrical devices In regions that are susceptible to electrical storms we recommend you plug your compute module into a surge suppressor and disconnect telecommunication lines to your modem during an electrical storm Provided with a properly grounded wall outle...

Page 139: ...ble parts Do not open the power supply Hazardous voltage current and energy levels are present inside the power supply Return to manufacturer for servicing When replacing a hot plug power supply unplug the power cord to the power supply being replaced before removing it from the server To avoid risk of electric shock turn off the server and disconnect the power cord telecommunications systems netw...

Page 140: ...ndling parts Always handle boards carefully They can be extremely sensitive to ESD Hold boards only by their edges After removing a board from its protective wrapper or from the server place the board component side up on a grounded static free surface Use a conductive foam pad if available but not the board wrapper Do not slide board over any surface Other Hazards Battery Replacement Caution Ther...

Page 141: ...ualifizierte Personen erfolgen Um die Einhaltung der vorhandenen Zulassungen und Genehmigungen für das Produkt zu gewährleisten sind die Richtlinien in diesem Handbuch sowie die Montageanleitungen in den Serverhandbüchern zu beachten Verwenden Sie nur die beschriebenen zugelassenen Komponenten die im vorliegenden Handbuch angegeben werden Die Verwendung anderer Produkte oder Komponenten führt zum ...

Page 142: ...tterungsquellen Abgeschirmt von starken elektromagnetischen Feldern die durch elektrische Geräte erzeugt werden In gewittergefährdeten Gebieten sollten Sie das System an einen Überspannungsschutz anschließen und bei einem Gewitter die Telekommunikationskabel zum Modem abziehen Eine ordnungsgemäß geerdete Wandsteckdose muß vorhanden sein Ausreichender Freiraum für den Zugang zu den Netzkabeln da di...

Page 143: ...genden Hinweise Halten Sie beim Transportieren und Anheben von Geräten die örtlichen Gesundheits und Sicherheitsvorschriften ein Verwenden Sie mechanische oder andere geeignete Hilfsmittel zum Transportieren oder Anheben von Geräten Entfernen Sie alle Komponenten die sich leicht abnehmen lassen um das Gewicht zu reduzieren und die Handhabung zu erleichtern ...

Page 144: ...icken Sie das Gerät für Wartungsarbeiten an den Hersteller zurück Wenn Sie ein hot plug fähiges Netzteil austauschen ziehen Sie dessen Netzkabel ab bevor Sie es aus dem Server ausbauen Zur Vermeidung von Stromschlägen schalten Sie den Server aus und trennen Sie vor dem Öffnen des Geräts das Netzkabel sowie alle an den Server angeschlossene Telekommunikationssysteme Netzwerke und Modems Warnhinweis...

Page 145: ...che Entladungen können zur Beschädigung von Festplatten Platinen und anderen Komponenten führen Daher sollten Sie alle Arbeiten an einer ESD Workstation ausführen Steht ein solcher Arbeitsplatz nicht zur Verfügung erzielen Sie einen gewissen Schutz vor elektrostatischen Entladungen durch Tragen einer Antistatik Manschette die Sie während der Arbeit zur Erdung an einem beliebigen unlackierten Metal...

Page 146: ...em nur mit angebrachten Gehäuseabdeckungen betrieben werden Die Inbetriebnahme des Systems ohne Abdeckung kann zur Beschädigung von Systemkomponenten führen So bringen Sie die Abdeckung wieder an Vergewissern Sie sich zunächst daß Sie keine Werkzeuge oder Teile im Gehäuse vergessen haben Prüfen Sie ob Kabel Erweiterungskarten sowie weitere Komponenten ordnungsgemäß angebracht sind Befestigen Sie d...

Page 147: ...uits composants annulera la liste UL et les autres approbations réglementaires du produit et le produit peut ne pas être conforme aux autres lois et réglementations locales applicables au produit Sécurité avertissements et mises en garde Pour éviter de vous blesser ou d endommager votre équipement lisez et respectez toutes les informations et consignes de sécurité avant de commencer l installation...

Page 148: ...eurs À l écart des sources de vibration ou des chocs physiques Isolé des champs électromagnétiques importants produits par des appareils électriques Dans les régions sujettes aux orages magnétiques nous vous recommandons de brancher votre système à un suppresseur de surtension et de déconnecter les lignes de télécommunication de votre modem pendant les orages Équipé d une prise murale reliée à la ...

Page 149: ...d débranchez le cordon du bloc d alimentation en cours de remplacement avant de le retirer du serveur Pour éviter tout risque d électrocution mettez le système hors tension et débranchez les cordons d alimentation ainsi que les systèmes de télécommunication réseaux et modems reliés au système avant d ouvrir ce dernier Avertissements sur l accès au système Attention Pour éviter de vous blesser ou d...

Page 150: ...tallique non peinte de votre serveur lorsque que vous manipulez les pièces Manipulez toujours les cartes avec précaution Elles peuvent être extrêmement sensibles aux ESD Ne tenez les cartes que par leurs bords Après avoir retiré une carte de son emballage de protection ou du serveur placez la sur une surface reliée à la terre exempte de charge statique composants orientés vers le haut Utilisez si ...

Page 151: ...tel En el caso de que haya diferencias entre la información para un producto en particular contenida en este documento y la información proporcionada con dicho producto o en el sitio Web la documentación del producto es la que prevalece Sólo personal técnico calificado debe montar y prestar los servicios para el servidor Debe ceñirse a las directrices de esta guía y a las instrucciones de montaje ...

Page 152: ...ón Bien ventilada y alejada de fuentes de calor incluida la luz solar directa y los radiadores Alejada de fuentes de vibración o de golpes físicos Aislada de campos electromagnéticos producidos por dispositivos eléctricos PRECAUCIÓN Indica la existencia de un riesgo que podría causar lesiones personales o daños en la propiedad leves si no se tiene en cuenta la PRECAUCIÓN ADVERTENCIA Indica la exis...

Page 153: ... o stand by NO DESCONECTA completamente la alimentación de CA del sistema ya que el modo de reposo de 5 V sigue activo mientras el sistema está enchufado Para desconectar el sistema debe desenchufar el cable de alimentación de CA de la toma de la pared Puede usar más de un cable de alimentación de CA con el sistema Asegúrese de que todos los cables de alimentación de CA están desenchufados Asegúre...

Page 154: ...cte todos los cables y líneas de telecomunicación que estén conectados al sistema Guarde todos los tornillos o elementos de fijación cuando retire las cubiertas de acceso Cuando termine de operar en el interior del producto vuelva a colocar los tornillos o los elementos de fijación originales de la cubierta de acceso No acceda al interior de la fuente de alimentación No hay elementos en la fuente ...

Page 155: ... el lado de los componentes hacia arriba sobre una superficie con toma de tierra y sin carga estática Utilice una almohadilla de espuma conductora si dispone de ella pero nunca el envoltorio de la tarjeta No deslice la tarjeta sobre ninguna superficie Otros peligros Sustitución de la batería Precaución Existe el peligro de explosión si la batería no se reemplaza correctamente Al reemplazar la bate...

Page 156: ...ositivos láser Precaución Para evitar el riesgo de la exposición a radiaciones o de daños personales No abra la caja de ningún periférico o dispositivo láser Los periféricos o dispositivos láser no pueden ser reparados por el usuario Haga que el fabricante los repare ...

Page 157: ...Web 站点信息之间存在不一致 请以产品文档为准 服务器须由合格的技术人员进行集成和维护 必须遵守本指南的规定和服务器手册的装配指导 以确保符合现有的产 品认证和审批 仅使用本指南中描述和规定的指定组件 使用其他产品 组件将使产品的 UL 认证和其他管理审批无效 并可能导致产品不符合销售地的产品法规 安全警 告与注意 事项 为避免人身伤害与财产损失 安装本产品之前 请阅读以下所有安全指 导和信息 下面所列的安全符号可能在整个文档中使用并可能标注于产 品和 或产品包装之上 注意 表示如果无视此 注意事项 存在可能引起轻微人身伤害或财产损失的危险 警告 表示如果无视此 警告 存在可能引起严重人身伤害的危险 表示如果无视所示信息 即存在潜在的危险 表示如果不遵守安全指导 存在可导致严重伤害或死亡的电击危险 表示灼热组件或表面 表示请勿触摸风机叶片 否则可能致伤 表示拔下所有交流电线 断开交流电源...

Page 158: ...144 Intel Server System SR2612UR Service Guide ...

Page 159: ...Intel Server System SR2612UR Service Guide 145 ...

Page 160: ...146 Intel Server System SR2612UR Service Guide ...

Page 161: ...Intel Server System SR2612UR Service Guide 147 ...

Page 162: ...148 Intel Server System SR2612UR Service Guide ...

Reviews: