EonStor S12E-R1132-4/G1133-2 Installation and Hardware Reference Manual
kilograms (44 lbs.). Two people will be required to install or
relocate the subsystem.
16. Handle system modules by the retention screws, ejection levers,
or the module’s metal frame/faceplate only. Avoid touching the
PCB boards or connector pins.
17. Always secure every enclosure module with its retention screws
or make sure it is held in place by its ejection levers.
18. When you work with the subsystem, it is important to use tools
with care. Do not place tools or other items on top of the
enclosure to avoid damaging the outward appearance.
2.3.2 Static-free Installation
Static electricity can damage the system’s electronic components. To
prevent ESD damage to any of the components, follow these
precautions before touching or handling them:
․
Discharge the static electricity accumulated in your body by
wearing an anti-static wristband.
․
Use antistatic strap during handling. Connect the equipment
end of the strap to an unfinished chassis surface.
․
Avoid carpets, plastic, vinyl, and styrofoam in your work area.
․
If the need should arise for carrying subsystem modules from
one place to another, carry them in a static shielding container.
․
Avoid the contact between circuit boards and clothing.
․
the exposed circuitry on PCB boards and
connector pins.
d
instructions for each component are given in the following sections.
1.
m that all components
on the list were included. (See
Section 0
)
2.
r cabinet requires at least two (2) people. (See
Section 2.6
)
Handle all components by holding their edges or metal frames.
Avoid touching
2.4 General Installation Procedure
Following all the instructions provided below can ensure correct
installation and minimize installation time. Detailed, illustrate
Unpack:
Unpack the subsystem and confir
Rack/Cabinet installation:
If the subsystem is going to be
installed in a rack or cabinet, that should be done before the
enclosure is populated by hard drives. Installing the subsystem
into a rack o
2-6