background image

× 

15

× 

12

× 

500

× 

60

× 

30

5

×

70

4

×

50

6

×

140

1,4X40

M8

×

60

Ø 3 

mm

Ø 4 mm

Ø 5 mm

Ø 8 mm

× 

70

4

×

40

1/20

CARINA 28

PREPARE THE 

GROUND

, UNWRAP THE 

PACKAGE, 

LAY OUT THE 

COMPONENTS

, FIND THE 

TOOLS.

Summary of Contents for Carina 28

Page 1: ... 15 12 500 60 30 5 70 4 50 6 140 1 4X40 M8 60 Ø 3 mm Ø 4 mm Ø 5 mm Ø 8 mm 70 4 40 1 20 CARINA 28 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS ...

Page 2: ...AKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C D B AB CD 0 IFB2 ...

Page 3: ... 20 6 140 3 20 CARINA 28 ASSEMBLE THE FOUNDATION WITH SCREWS 4 ...

Page 4: ...m 4 20 CARINA 28 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BL 1 6 140 1 BL 2 1 BL 1 A LG 5 B LG 5 5 70 5mm ...

Page 5: ... 4 5 70 Ø 4 mm 6 6 140 Ø 5 mm 5 20 CARINA 28 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 1 1 LG 3 1 LG 2 6 140 5 70 ...

Page 6: ...6 20 CARINA 28 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK ...

Page 7: ...7 20 CARINA 28 13 SLIDE THE DOOR IN ATTACH THE HANDLE BDD4R 3 LOGS IN PLACE ...

Page 8: ...8 20 CARINA 28 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK 1 LG 1 1 LG 2 ...

Page 9: ...9 20 CARINA 28 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 BW2 ...

Page 10: ... 8 6 140 Ø 5 mm 10 20 CARINA 28 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 16 LOGS IN PLACE 1 TL 1 A LG 1 B LG 4 B LG 1 A LG 2 1 LG 4 B LG 2 B LG 3 A LG 3 A LG 4 ...

Page 11: ... 6 6 140 Ø 4 mm 11 20 CARINA 28 43 INSTALL THE ROOF PURLINS AND ROOF ELEMENTS 1 ATTACH THEM WITH SCREWS RFB ...

Page 12: ... 185 4 50 12 20 CARINA 28 84 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 10 SCREWS 5 INTO EACH NEXT RB ...

Page 13: ...85 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS 24 4 40 13 20 CARINA 28 RR1 RR3 ...

Page 14: ...86 RR2 EE EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED 28 4 40 Ø 3 mm 14 20 CARINA 28 ...

Page 15: ... 270 4 50 15 20 CARINA 28 89 20 SCREWS INTO THE FIRST FLOORBOARD 10 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB ...

Page 16: ... 30 1 4x40 16 20 CARINA 28 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB ...

Page 17: ... 12 M8 60 Ø 8 mm 17 20 CARINA 28 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 4CM 20CM WINDBOARD ...

Page 18: ...90º 90º 18 20 CARINA 28 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90º ...

Page 19: ...19 20 CARINA 28 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES ...

Page 20: ...20 20 CARINA 28 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100 ...

Reviews: