6 | Operation
INFICON
60 / 100
Pernicka-700H-CHLD-Operating-instructions-jin76aen1-04-(1911)
Flange to connect
an external calibration leak
Lid for
test chamber
Flange
2
3
4
5
6
1
Fig. 31: Connect external calibration leak
4
Close the lid of the empty test chamber.
5
Open the hand valve on the external calibration leak.
6
Mini > Leak Test or Measure > Leak Test.
ð
The leak rate of the external calibration leak is determined in the measurement
unit [mbar l/s] or [atm cc/s].
6.5 Measuring
6.5.1 Preparing the measurement
NOTICE
Material damage due to improper filling of the test chamber
If the test chamber is operated without a grid inserted, test objects from the test
chamber can be sucked into the device and cause damage to the device.
► In order to carry out measurements, place the grid that is supplied with the test
chamber in the test chamber.
► To remove dirt from the test chamber, vacuum the dirt with a suitable vacuum
cleaner and then wipe the test chamber with a cloth soaked in isopropanol.
ü
Possible alternatives to the operating possibilities on the device are set up
(optional), e.g. bar code reader for the automatic data acquisition of the test objects.
Summary of Contents for Pernicka 700H CHLD
Page 2: ...INFICON GmbH Bonner Strasse 498 50968 Cologne Germany ...
Page 99: ......
Page 100: ......