5 | Installation
INFICON
28 / 100
Pernicka-700H-CHLD-Operating-instructions-jin76aen1-04-(1911)
5 Installation
5.1 Prerequisites for the installation
Read and observe the supplied documentation for the compressor "Cryo-Torr Pump
Installation, Operation and Maintenance Instructions".
Read and observe the technical data. See original operating instructions, chapter
26]".
ü
The device, the cryogenic pump compressor and all parts included in the scope of
delivery have been unpacked and checked for external damage. See original
operating instructions, chapter "Shipment, Transport, Storage [
13]".
ü
The prerequisites for a successful measurement operation defined in the following
list are met.
► Check.
Present
Not
present
Device footprint: 1 m
2
⃞
⃞
Compressor footprint: 0.5 m
2
⃞
⃞
Allowable ambient temperature for the device (when
operating): 15 °C ... 28 °C
⃞
⃞
Allowable ambient temperature for the compressor
(when operating): 10 °C ... 38 °C
⃞
⃞
Max. relative humidity for the device up to 31 °C: 80 %
⃞
⃞
Device nominal power: 2300 VA
⃞
⃞
Device nominal voltage: 110 V, 50/60 Hz
(Order number: 550-700)
Device nominal voltage: 230 V, 50/60 Hz
(Order number: 550-701)
⃞
⃞
Device nominal current: 15 A (Order number: 550-700)
Device nominal current: 10 A (Order number: 550-701)
⃞
⃞
Compressor nominal voltage: 208 V ... 240 V, 50/60 Hz
⃞
⃞
Compressor nominal current: 10 A
⃞
⃞
Operate the compressor on a separate electrical circuit
⃞
⃞
Compressed air supply: 7.5 bar - 9 bar
⃞
⃞
Compressed air connection: 6 mm hose
⃞
⃞
Summary of Contents for Pernicka 700H CHLD
Page 2: ...INFICON GmbH Bonner Strasse 498 50968 Cologne Germany ...
Page 99: ......
Page 100: ......