2-8-1-Equipment configuration
Communication with the centralized computer system is connected to the PC associated with the analyser and
can be made by:
•
RS232C link. DB9 standard pinouts.
•
TCP/IP link. Ethernet cable (RJ45,8 pins)
2-8-2- Change to connection setup
The connection set-up for the interface can be found under SET-UP/SETTINGS/LOCAL SYSTEM:
•
With RS232C selected:
2- ASTM Compatible Version
2-8- Line of Communication
IDS-iSYS Connection Protocol - Revision N1
2- ASTM Compatible Version
17
Software version V 14
Summary of Contents for IDS-iSYS
Page 7: ......
Page 13: ...SECTION 1 Operating principle...
Page 30: ...SECTION 2 User Interface Software...
Page 48: ...SECTION 3 Use...
Page 119: ...SECTION 4 Messages...
Page 130: ...SECTION 5 Maintenance...
Page 165: ...SECTION 6 Problems Corrective Action...
Page 169: ...SECTION 7 System Configuration...
Page 182: ...Appendices...