iBAT 2.0-CIM01C2
User Manual
9 Maintenance
Issue 07 (2019-01-02)
Copyright © Huawei Technologies Co., Ltd.
60
Item
Expected Result
Troubleshooting
BIM connection
The BIM is attached
firmly.
All BIM cables are
securely connected.
No BIM cable
deteriorates and the
insulation layer does not
crack.
Secure the BIM again.
Verify that all BIM
cables are securely
connected.
Replace the faulty cable.
CIM connection
The CIM is attached
firmly.
The cable to the PoE port
is connected securely.
If a cable connects to the
COM port, check that the
cable connection is
secure.
If a cable connects to the
BCB port, check that the
cable connection is
secure.
The cable to the HALL
current monitoring port
is connected securely.
Secure the CIM again.
Reconnect the cable to
the PoE port.
Reconnect the cable to
the COM port.
Reconnect the cable to
the BCB port.
Reconnect the cable to
the HALL current
monitoring port.
If the fault persists, contact Huawei technical support.