iBAT 2.0-CIM01C2
User Manual
5 System Commissioning
Issue 07 (2019-01-02)
Copyright © Huawei Technologies Co., Ltd.
42
Figure 5-3
Login page
Step 5
Set CIM parameters.
V289B003 and earlier versions
a.
On the CIM WebUI home page, choose
Monitoring
>
CIM System
>
Running
Parameter
, and set
Parallel Configuration
and
Basic Information
.
b.
On the CIM WebUI home page, choose
System Settings
>
Batt. String Config
,
and set
Batt. String Config
.
Parameter
Description
Parallel
Configuration
This parameter needs to be set when multiple CIMs are connected in
parallel and does not need to be set when there is only one CIM. Set
Parallel Configuration
to
Parallel
, and set
CIM parallel qty.
.
Configure IP addresses for multiple CIMs.
Current source or
Current acquisition
source
The actual specifications of the Hall effect sensor prevail.
Battery N line
Set whether there is a battery N wire according to the actual
situation.
Multi-Hall cur.
setting
The number of positive or negative Hall effect sensors in a single
battery string and should be greater than or equal to 1.
Total battery
capacity
One iBOX: Capacity of one battery string x Number of battery
strings connected in parallel.
N iBOXs connected in parallel: Capacity of one battery string x
(Number of battery strings managed by iBOX 1 + … + Number
of battery strings managed by iBOX N).
Batt. installation
time
Time when the battery is installed for the first time. Does not need
to be reset when part of batteries are replaced.
BIM Number of
CIM
Indicates the total number of BIMs managed by the CIM.
Batt. String Qty. or
Number of battery
strings
The number of battery strings managed by the CIM.