FusionModule5000 Smart Modular Data Center
Commissioning Guide
5 Commissioning the Cooling System
Issue 06 (2020-03-20)
Copyright © Huawei Technologies Co., Ltd.
47
Tapping
No
or
Exit
, submission timeout, and system exception all result in commissioning
failures. Choose
Maint
>
Wizard Startup
to enter the
Wizard Startup
screen for new
commissioning.
Procedure
Step 1
On the home screen, choose
Maint
>
Wizard Startup
, as shown in
Figure 5-14
Startup wizard
For the initial startup wizard,
Last record
is in grey, indicating that the operation is not allowed.
For the non-initial startup wizard, choose
Last record
and you can view the last startup wizard
report.
Step 2
Tap
Yes
. The checking before startup screen is displayed, as shown in
Figure 5-15
Checking before startup
Step 3
Tap
Yes
for check items one by one according to the prompt messages on the screen.
Step 4
Tap
Yes
and enter the screen where you select commissioning items, as shown in