
Index
215
SCSI ID Settings
,
191
Remove and Replace Procedures by Part
,
124
Removing Users
,
72
,
82
,
85
Return the GSP to Default Configurations
,
73
Revision A GSP
,
50
,
54
Revision B GSP
,
51
,
54
rp5400 and rp5450 I/O Block Diagram
,
103
rp5400 and rp5450 System Block Diagram
,
102
rp5400/rp5450 PCI Card Slots
,
32
rp5430 and rp5470 System Block Diagram
,
104
,
105
rp5470 PCI Card Slots
,
33
rp54xx Server Boot Process
,
74
Run/Attention/Fault LED States
,
106
S
Sample System Alerts
,
97
Secure Web Console Installation
,
68
Side Cover Removal
,
140
Side Cover Replacement
,
141
Site Preparation
Computer Room Safety
,
252
Fire Protection
,
252
Lighting Requirements for Equipment Servicing
,
252
Distribution Hardware
,
254
Building Distribution
,
254
Wire Selection
,
254
Electrical Factors
,
252
Electrical Load Requirements (Circuit Breaker
Sizing)
,
253
Grounding Systems
,
255
Power Consumption
,
253
Power Quality
,
253
Power System Protection
,
254
Sources of Voltage Fluctuations
,
253
Space Requirements
,
242
Stand-alone Server Cover Removal
,
135
Stand-alone Server Cover Replacement
,
137
Stationary L-Bracket Rail Assembly
,
17
System Board Removal
,
195
Removing rp5400 and/or rp5450 Model System
Boards
,
195
Removing rp5470 Model System Board
,
196
System Board Replacement
,
197
rp5400 or rp5450 System Board Replacement
,
197
Configuring System Board
,
198
rp5470 System Board Replacement
,
201
Power up procedure.
,
204
System Installation Guidelines
,
257
T
Temperature and Humidity Operating Standards
,
250
Thermal Protection Features
,
250
Top Cover Removal
,
138
Top Cover Replacement
,
139
Troubleshooting and FRU identification
,
89
U
Uncrating Space
,
242
Unpacking the SPU
,
5
V
V-Class system
temperature and humidity specifications
,
250
W
Wiring Connections
,
257
Summary of Contents for L1000 - 9000 - 0 MB RAM
Page 7: ...Contents vii Typical Installation Schedule 207 Site Inspection 208 Delivery Survey 212 ...
Page 8: ...Contents viii ...
Page 10: ...Tables x ...
Page 12: ...Figures xii ...
Page 14: ...xiv ...
Page 16: ...Chapter 1 Server Overview 2 ...
Page 17: ...Chapter 2 3 2 Server Unpacking and Installation ...
Page 37: ...Chapter 3 23 3 Installing Additional Components ...
Page 60: ...Chapter 3 Installing Additional Components Installing Disk Drives 46 ...
Page 61: ...Chapter 4 47 4 Cable Connections ...
Page 91: ...Chapter 5 77 5 Utilities ...
Page 98: ...Chapter 5 Utilities Configuring the Rev B Guardian Service Processor GSP 84 ...
Page 99: ...Chapter 6 85 6 Troubleshooting ...
Page 134: ...Chapter 6 Troubleshooting Fan Power Supply and Disk LED States 120 ...
Page 189: ...Appendix A 175 A Parts and Accessories ...