![HP 8562E Service Manual Download Page 144](http://html.mh-extra.com/html/hp/8562e/8562e_service-manual_161511144.webp)
Procedure 5. A2, A3,
and AS Assemblies
W22
W23
W25
w 2 9
W52
W27
w54
w55
COAX
0
COAX
9 2
COAX
4
COAX
7
COAX
9
COAX
3
COAX
2
C A B L E C L I P
Figure 4-9. Coaxial Cable Clip
7. Check to ensure that no cables will become pinched under the hinges when folding up the
A4 and A5 assemblies.
8. Fold the A4 and A5 assemblies together as a unit into the spectrum analyzer. Use caution
to avoid damaging any cable assemblies. The standoffs on the A5 assembly must fit into
the cups on the A6 power supply top shield.
9. Fold the A2 and A3 assemblies together as a unit into the spectrum analyzer. Be sure to
fold HP-IB cable
between the A3 and A4 assemblies, using the two sets of hook
and loop (Velcro) fasteners.
10. Fold ribbon cable
between A3 and A4 assemblies. Take care to dress the
protective tubing as close to
connector as possible, so that the tubing does not
fold with the cable. See Figure 4-10.
11. Attach ribbon cable W4 to
while folding up the assemblies.
Assembly Replacement 4-19
Summary of Contents for 8562E
Page 21: ...A l HP 85623 Interconnect Block Diagram A 5 Contents 14 ...
Page 205: ...8560E Series sl131e FIGURE 5 3 PARTS IDENTIFICATION MAIN CHASSIS v ...
Page 219: ...FL 4 Bl Figure 6 9 Rear View BTl A20 SK162 Major Assembly and Cable Locations 6 l1 ...
Page 271: ......
Page 272: ......
Page 273: ......
Page 274: ......
Page 314: ......
Page 355: ......
Page 356: ......
Page 357: ......
Page 374: ......
Page 425: ......
Page 426: ......
Page 450: ......
Page 469: ......
Page 470: ......
Page 474: ......