5 UCN Exerciser
5.5 Test Operation
398
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
Step
Action
5
Configure the MESSAGE MIX parameter by selecting one of the three targets
TYPE 1
Send only Type 1 messages. These are
unacknowledged unconnected
messages.
TYPE 3
Send only Type 3 messages. These are acknowledged
messages.
BOTH
Send both Type 1 and Type 3 messages.
Figure 196 and Figure 197 show
TYPE 3
selected.
6
Configure the
PRIORITY
parameter by selecting one of two targets.
LOWEST
Send messages at the lowest priority.
ALL
Send messages at each of four priorities.
7
Configure the
MSGSIZ
(MESSAGE SIZE) parameter by selecting one of two targets.
SMALL
Send 50 word messages.
SMLRG
Send 50 and 100 word messages.
8
Configure the end time date parameter by selecting the
END TIME
target and entering
the date in the format shown. Press <
ENTER
>. Enter the time parameter in the format
shown and press <
ENTER
>.
9
Select the
STRT
(START) target followed by the
EXEC
(EXECUTE) target to start the
test. The
EXEC
target appears to the right of the
ENDCYC
(END CYCLE) target when
the
STRT
target has been selected.
There are five commands shown in Figures Figure 196 and Figure 197. To execute the
chosen command, the
EXEC
target must also be selected. The following commands
are available.
STRT
Starts the RDR and Triangulation test.
RESET CONFG
Resets the configuration to off for all nodes.
RESET STATS
Resets the statistics to zero.
IMED ABRT
Aborts the test wherever it is in the procedure.
ENDCYC ABRT
Aborts the test at the end of the current test cycle.
10
Select the
TEST OVRVW
(TEST OVERVIEW)
target to return to the UCN Exerciser
Overview display. See Figure 196 and Figure 197 . Wait for the test to complete. The
NOTRUNNG
(NOT RUNNING) status appears on the UCN Exerciser Overview display
as shown in Figure 193.
Summary of Contents for HPM
Page 178: ......
Page 300: ......
Page 390: ......
Page 497: ......
Page 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...