2 Equipment Description
2.27 EUCN Cable System
R688
HPM High-Performance Process Manager Service
163
December 2020
Honeywell
Ports 1 to 8
No Cable
Connected
No Traffic
Present,
Traffic
Attached
Devices
Uplink Port
No Power or
No Cable
Connected
Link Present,
No Traffic
N/A
Link
Present,
Traffic
N/A
Note: The CF9 has detected a soft failure and is working in a diminished state. Typical causes are a
disconnected uplink port cable or a downlink port with too many attached devices. (Only one device can
be attached to a CF9 downlink port.)
Summary of Contents for HPM
Page 178: ......
Page 300: ......
Page 390: ......
Page 497: ......
Page 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...