2 Equipment Description
2.27 EUCN Cable System
152
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
Table 18 UCN Node (PM/APM/HPM) Cable Faults (Primary NIM node is an ENB)
Error scenario
UCN COMM STATUS
UCN CABLE
STATUS/FTE
CABLE STATUS
$FTESTS2
displays
(PM/APM/HPM
with cable faults)
$FTESTS2
displays
(all other
EUCN nodes)
No UCN coaxial
cable problems
A
SIL
B
SIL
A
NSY
B
NSY
OK/OK
UCN: OK/BACKUP
LCN: OK/BACKUP
N/A
N/A
If UCN cable A
on a
PM/APM/HPM
node has a
problem
A
SIL
B
SIL
A
NSY
B
NSY
FAIL/OK
UCN: OK/BACKUP
LCN: OK/BACKUP
N/A
N/A
*
If UCN cable B
on a
PM/APM/HPM
node has a
problem
A
SIL
B
SIL
A
NSY
B
NSY
FAIL/OK
UCN: OK/BACKUP
LCN: OK/BACKUP
N/A
N/A
*
If both UCN cable
A and B on a
PM/APM/HPM
node have a
problem
Primary fails,
Secondary takes
over as the
primary
A
SIL
B
SIL
A
NSY
B
NSY
OK/OK
UCN:
PARTFAIL/OFFNET
LCN: OK/BACKUP
N/A
N/A
*
[1]
*
[1]
Note:
PM/APM/HPM are UCN nodes and hence the $FTESTS displays are not applicable.
[1]
Note:
The A SIL, B SIL, A NSY, and B NSY indications only appear for an instant and then shows
blank due to node failure.
Note:
If any SIL or NSY bits are set, then the corresponding cables are backlit on the UCN Status
Display, if the UCN CABLE STATUS target is chosen.
Summary of Contents for HPM
Page 178: ......
Page 300: ......
Page 390: ......
Page 497: ......
Page 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...