Unit Control
has been activated, this function cannot be activated at the same tim
e. When ―
Disinfection
‖ has been
activated, ―
Emergen.mode
‖, ―
Holiday mode
‖, ―
Floor debug
‖ ―
Manual defrost
‖, or ―
Refri. recovery
‖
setting will fail and a window will pop up, saying ―
Please disable the disinfect mode!
‖
● ―
Disinfection
‖ can be activated no matter if the unit is turned on or off. This mode will take priority
over the ―
Hot water
‖ mode.
● When disinfection operation fails, the display panel will tell ―
Disinfection fail!
‖. Then, by pressing
OK it will be cleared.
● When ―
Disinfection
‖ has been activated, if communication error with the indoor unit or malfunction
of the water tank heater occurs, it will automatically quit.
●It will be memorized upon power failure.
3.2.2.10 Clock Timer
[Operation Instructions]
★
At the function setting page, access to
the ―
Clock timer
‖ setting page.
★
At the ―
Clock time
r‖ setting page, it can be set to ―
On
‖ or ―
Off
‖.
★
The option ―
Mode
‖ is used to time the desired mode; ―
WOT-Heat
‖ and ―T
-
water tank”
is used to set
the corresponding water temperature; ―
Period
‖ is used to for time setting. After that, by touching the
―
Save
‖ icon, all settings will be saved.
[Notes]
● When ―
Clock timer
‖ has been set and ―
Hot water
‖ mode is involved, in this case, if ―
Water tank
‖ is
changed to ―
Without
‖, ―
Hot water
‖ will be automatically switched to ―
Heat”
, and ―
Cool/Heat + Hot
water
‖ will be switched to ―
Cool/Heat
‖.
● When ―Weekly timer‖ and ―Clock timer‖ have been set at the same time, the priority will be given to the
former.
● When the water tank is available, ―
Heat
‖, ―
Cool
‖, ―
Hot
‖, ‗
Heat + Hot water
‖, and ―
Cool + Hot water
‖
are allowed; however, when the water tank is unavailable, only ―
Heat
‖ and ―
Cool
‖ are allowed.
● When the end time is earlier than the start time, this setting is invalid.
Summary of Contents for VERSATI III Series
Page 1: ...VERSATI Ⅲ Air To Water Heat Pump ...
Page 5: ...Engineering Data ENGINEERING DATA ...
Page 10: ...Engineering Data 1 4 Operating Principle 1 4 1 Schematic Diagram ...
Page 22: ...Design and Selection DESIGN SELECTION ...
Page 33: ...Unit Control UNIT CONTROL ...
Page 72: ...Unit Control ...
Page 76: ...Unit Control 3 3 2 Setting of Main Functions 1 Set mode and temperature ...
Page 79: ...Unit Control 3 3 3 2 Help Click Help and view the operation instructions of the APP ...
Page 80: ...Unit Control ...
Page 81: ...Unit Control 3 3 3 3 Feedback Click Feedback to submit feedback ...
Page 82: ...Installation UNIT INSTALLATION ...
Page 113: ...Test Operation Troubleshooting Maintenance TEST OPERATION TROUBLESHOOTING MAINTENANCE ...
Page 118: ...Test Operation Troubleshooting Maintenance 3 2 Comp Low pressure Protection E3 ...
Page 119: ...Test Operation Troubleshooting Maintenance 3 3 Comp Discharge Temp Protection E4 ...
Page 121: ...Test Operation Troubleshooting Maintenance 3 5 DC Fan Error EF 3 6 Temperature Sensor Error ...
Page 122: ...Test Operation Troubleshooting Maintenance 3 7 Communication Malfunction E6 ...
Page 123: ...Test Operation Troubleshooting Maintenance 3 8 Capacity Switch Error Code C5 ...
Page 125: ...Test Operation Troubleshooting Maintenance IPM or PFC Over temperature Protection Code P8 ...