Unit Control
2.2 Operation Conditions
Capacities and power inputs are based on the following conditions (floor heating /cooling )
a. Cooling conditions
b. Heating conditions
Indoor Water Temp 23°C/18°C;
Indoor Water Temp 30°C/35°C;
Outdoor Air Temp 35°C DB/24°C WB
Outdoor Air Temp 7°C DB/6°C WB
Capacities and power inputs are based on the following conditions (FCU or radiator)
a. Cooling conditions
b. Heating conditions
Indoor Water Temp 12°C/7°C;
Indoor Water Temp 40°C/45°C;
Outdoor Air Temp 35°C DB/24°C WB
Outdoor Air Temp 7°C DB/6°C WB
2.3 Flowchart of Model Selection
2.4 Design Principle
Cooling:
capacity of the unit ≥ cooling load of the air conditioning
Heating: capacity of the unit ≥ max{ heating load, floor heating load, water heating load}
Water Tank: it should be selected based on the sanitary outfit or quantity of users. Each unit
can accommodate only one water tank.
3 Selection of the Underfloor Coils
3.1 Calculation of Unit Load for Floor Heating
Empirical Values of Floor Heating Load Per Square Meter
House W/m
2
Dining Room
100~120
Mater Room
100~110
Guest Room
110~130
Study Room
90~110
Villa W/m
2
Dining Room
110~140
Mater Room
100~120
Summary of Contents for VERSATI III Series
Page 1: ...VERSATI Ⅲ Air To Water Heat Pump ...
Page 5: ...Engineering Data ENGINEERING DATA ...
Page 10: ...Engineering Data 1 4 Operating Principle 1 4 1 Schematic Diagram ...
Page 22: ...Design and Selection DESIGN SELECTION ...
Page 33: ...Unit Control UNIT CONTROL ...
Page 72: ...Unit Control ...
Page 76: ...Unit Control 3 3 2 Setting of Main Functions 1 Set mode and temperature ...
Page 79: ...Unit Control 3 3 3 2 Help Click Help and view the operation instructions of the APP ...
Page 80: ...Unit Control ...
Page 81: ...Unit Control 3 3 3 3 Feedback Click Feedback to submit feedback ...
Page 82: ...Installation UNIT INSTALLATION ...
Page 113: ...Test Operation Troubleshooting Maintenance TEST OPERATION TROUBLESHOOTING MAINTENANCE ...
Page 118: ...Test Operation Troubleshooting Maintenance 3 2 Comp Low pressure Protection E3 ...
Page 119: ...Test Operation Troubleshooting Maintenance 3 3 Comp Discharge Temp Protection E4 ...
Page 121: ...Test Operation Troubleshooting Maintenance 3 5 DC Fan Error EF 3 6 Temperature Sensor Error ...
Page 122: ...Test Operation Troubleshooting Maintenance 3 7 Communication Malfunction E6 ...
Page 123: ...Test Operation Troubleshooting Maintenance 3 8 Capacity Switch Error Code C5 ...
Page 125: ...Test Operation Troubleshooting Maintenance IPM or PFC Over temperature Protection Code P8 ...