Installation
Net weight
kg
68
71
82
87
Gross weight
kg
77
80
92
97
Joints Dimension
Description
Joint pipe thread
Hot water outlet of water tank
1/2″Female BSP
Circulating water inlet/outlet of water tank
3/4″Female BSP
Cooling water inlet of water tank
1/2″Female BSP
Pipe joint
3/4″Female BSP
4.7.3 Connection of waterway system
(1) If connection between water tank and indoor unit should be through the wall, drill a hole φ70 for
pass of circulating water pipe. It is unnecessary if the hole is not needed.
(2) Preparation of pipelines: Circulating water outlet/inlet pipe must be hot water pipe, PPR pipe with
nominal out diameter of dn25 and S2.5 series (wall thickness of 4.2mm) being recommended. Cooling
water inlet pipe and hot water outlet pipe of water tank should also be hot water pipe, PPR pipe with
nominal out diameter of dn20 and S2.5 series (wall thickness of 3.4mm) being recommended. If other
insulated pipes are adopted, refer to the above dimensions for out diameter and wall thickness.
(3) Installation of circulating water inlet/outlet pipes: connect the water inlet of the unit with circulating
outlet of water tank and water outlet of unit with circulating inlet of water tank.
(4) Installation of water inlet/outlet pipes of the water tank: safety check valve, filter and cut-off valve
must be installed for the water inlet pipe according to the installation sketch of the unit. At least a cut-off
valve is needed for the water outlet pipe.
(5) Installation of blow-off pipes at the bottom of water tank: connect a piece of PPR pipe with
drainage outlet to floor drain. A cut-off valve must be installed in the middle of the drainage pipe and at
the place where it is easy to be operated by the users.
(6) After connection of all waterway pipelines, perform the leakage test firstly. After that, bind up the
water pipes, water temp sensor and wires with wrapping tapes attached with the unit.
(7) Refer to Installation Sketch of the Unit for details.
Description
Joint pipe thread
Circulating water inlet/outlet of main unit
1″Male BSP
Cooling water inlet of water tank
1/2″Female BSP
Circulating water inlet/outlet of water tank
3/4″Female BSP
Hot water outlet of water tank
1/2″Female BSP
Summary of Contents for VERSATI III Series
Page 1: ...VERSATI Ⅲ Air To Water Heat Pump ...
Page 5: ...Engineering Data ENGINEERING DATA ...
Page 10: ...Engineering Data 1 4 Operating Principle 1 4 1 Schematic Diagram ...
Page 22: ...Design and Selection DESIGN SELECTION ...
Page 33: ...Unit Control UNIT CONTROL ...
Page 72: ...Unit Control ...
Page 76: ...Unit Control 3 3 2 Setting of Main Functions 1 Set mode and temperature ...
Page 79: ...Unit Control 3 3 3 2 Help Click Help and view the operation instructions of the APP ...
Page 80: ...Unit Control ...
Page 81: ...Unit Control 3 3 3 3 Feedback Click Feedback to submit feedback ...
Page 82: ...Installation UNIT INSTALLATION ...
Page 113: ...Test Operation Troubleshooting Maintenance TEST OPERATION TROUBLESHOOTING MAINTENANCE ...
Page 118: ...Test Operation Troubleshooting Maintenance 3 2 Comp Low pressure Protection E3 ...
Page 119: ...Test Operation Troubleshooting Maintenance 3 3 Comp Discharge Temp Protection E4 ...
Page 121: ...Test Operation Troubleshooting Maintenance 3 5 DC Fan Error EF 3 6 Temperature Sensor Error ...
Page 122: ...Test Operation Troubleshooting Maintenance 3 7 Communication Malfunction E6 ...
Page 123: ...Test Operation Troubleshooting Maintenance 3 8 Capacity Switch Error Code C5 ...
Page 125: ...Test Operation Troubleshooting Maintenance IPM or PFC Over temperature Protection Code P8 ...