Engineering Data
Level
Dimension
s
(W×D×H)
Outline
mm
1200×460×878
Packaged
mm
1245×545×885
Net weight/Gross weight
kg
151/166
Notes
―*1‖ indicates the capacity and power input are tested based on the conditions below:
(1) Cooling
Indoor Water Temperature: 23°C/18°C; Outdoor Temperature: 35°CDB/24°CWB
(2) Heating
Indoor Water Temperature: 30°C/35°C; Outdoor Temperature: 7°CDB/6°CWB
―*2‖ indicates the capacity and power input are tested based on the conditions below:
(1) Cooling
Indoor Water Temperature: 12°C/7°C; Outdoor Temperature: 35°CDB/24°CWB
(2) Heating
Indoor Water Temperature: 40°C/45°C; Outdoor Temperature: 7°CDB/6°CWB
1.5.2 Nominal Working Conditions
Item
Water Side
Heat Source/User Side
Entering Water Temp
(°C)
Leaving Water
Temperature (°C)
Dry Bulb
Temperature (°C)
Wet Bulb
Temperature (°C)
FCU Cooling
12
7
35
—
FCU Heating
40
45
7
6
Floor Cooling
23
18
35
—
Floor Heating
30
35
7
6
Water Heating
53
-
7
6
1.5.3 Operation Range
Item
Water Side
Heat Source/User Side
Leaving Water Temperature (°C)
Environment Dry Bulb Temperature (°C)
Cooling
7
~
25
10~48
Heating
25
~
60
-25~35
Water Heating
40~80 (Water Tank Temperature)
-25~45
Note: when operating conditions are out of the range listed above, please contact GREE.
1.5.4 Electric Data
Model
Power Supply
Leakage Switch
Minimum Sectional
Area of Earth Wire
Minimum Sectional
Area of Power
Supply Wire
V,Ph,Hz
(A)
(mm
2
)
(mm
2
)
GRS-CQ4.0d/NhG-K
220-240V,~,50Hz
16
1.3
2×1.3
GRS-CQ6.0Pd/NhG-K
16
1.3
2×1.3
GRS-CQ8.0Pd/NhG-K
16
1.3
2×1.3
GRS-CQ10Pd/NhG-K
25
3.3
2×3.3
GRS-CQ12Pd/NhG-K
25
3.3
2×3.3
Summary of Contents for VERSATI III Series
Page 1: ...VERSATI Ⅲ Air To Water Heat Pump ...
Page 5: ...Engineering Data ENGINEERING DATA ...
Page 10: ...Engineering Data 1 4 Operating Principle 1 4 1 Schematic Diagram ...
Page 22: ...Design and Selection DESIGN SELECTION ...
Page 33: ...Unit Control UNIT CONTROL ...
Page 72: ...Unit Control ...
Page 76: ...Unit Control 3 3 2 Setting of Main Functions 1 Set mode and temperature ...
Page 79: ...Unit Control 3 3 3 2 Help Click Help and view the operation instructions of the APP ...
Page 80: ...Unit Control ...
Page 81: ...Unit Control 3 3 3 3 Feedback Click Feedback to submit feedback ...
Page 82: ...Installation UNIT INSTALLATION ...
Page 113: ...Test Operation Troubleshooting Maintenance TEST OPERATION TROUBLESHOOTING MAINTENANCE ...
Page 118: ...Test Operation Troubleshooting Maintenance 3 2 Comp Low pressure Protection E3 ...
Page 119: ...Test Operation Troubleshooting Maintenance 3 3 Comp Discharge Temp Protection E4 ...
Page 121: ...Test Operation Troubleshooting Maintenance 3 5 DC Fan Error EF 3 6 Temperature Sensor Error ...
Page 122: ...Test Operation Troubleshooting Maintenance 3 7 Communication Malfunction E6 ...
Page 123: ...Test Operation Troubleshooting Maintenance 3 8 Capacity Switch Error Code C5 ...
Page 125: ...Test Operation Troubleshooting Maintenance IPM or PFC Over temperature Protection Code P8 ...