Progress Description for Commissioning Phases
——
Commissioning Code Progress Code
Status Code
Meaning
Progress
LED1
LED2
LED3
Code
Display
Status
Code Display
Status
Code
Display
Status
13_
—
—
—
—
—
—
No meaning.
14_
—
—
—
—
—
—
No meaning.
15_Cooling
operation by
manual perfusion
db
On
15
On
AC
On
The system is in cooling-mode
commissioning operation (the
system automatically selects the
commissioning operation mode
without needing manual settings).
db
On
15
On
Corresponding
fault code
On
A fault occurs on the cooling-mode
commissioning operation.
db
On
15
On
J0
On
A fault occurs on other modules
during the cooling-mode
commissioning operation.
db
On
15
On
U9
On
A fault occurs on ODU pipes or
valves.
db
On
15
On
XXXX/U8
On
The system detects pipe failure of
IDU. "XXXX" indicates the project
number of the faulty IDU. The fault
code "U8" is displayed after three
seconds. For example, if a U8 fault
occurs on IDU 100, LED3 will
circularly display "01", "00" (two
seconds later), and "U8" (two
seconds later).
16_Heating
operation by
manual perfusion
db
On
16
On
AH
On
The system is in heating-mode
commissioning operation (the
system automatically selects the
commissioning operation mode
without needing manual settings).
db
On
16
On
Corresponding
fault code
On
A fault occurs on the heating-mode
commissioning operation.
db
On
16
On
J0
On
A fault occurs on other modules
during the heating-mode
commissioning operation.
db
On
16
On
U9
On
A fault occurs on ODU pipes or
valves.
db
On
16
On
XXXX/U8
On
The system detects pipe failure of
IDU. "XXXX" indicates the project
number of the faulty IDU. The fault
code "U8" is displayed after three
seconds. For example, if a U8 fault
occurs on IDU 100, LED3 will
circularly display "01", "00" (two
seconds later), and "U8" (two
seconds later).
17_Commissioni
ng completion
status
01-04
On
OF
On
OF
On
The unit has completed
commissioning and in standby
status. LED1 displays the module
address; LED2 and LED3 display
"OF".
NOTE:
In commissioning status, press and hold "SW3" and "SW4" simultaneously for more than
five seconds to enter the no-wired-controller commissioning mode. In this mode, the system does not
detect the communication status between the wired controller and IDU.
2.3.3.2 Commissioning Operation Mode
The VRF provides three commissioning methods.
①
Commissioning through the main board of ODU
②
Commissioning on a PC through professional software. Parameters of the ODU and IDU can be
Summary of Contents for GMV5 Series
Page 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Page 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Page 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Page 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Page 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Page 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Page 321: ...JF00303868 ...