Step 5: Once it entered the engineering debugging, Portable Commissioning Tool will display
current progress of engineering debugging (step#). As for step 3, 4, 8 and 12, it needs to click “OK”
button to enter into the next step debugging. “Skip” can be selected for step 10. Detailed information
check is available for step 3, 4, 5, 6 and 7.
Step 6: Once engineering debugging is finished, the outdoor unit displays 01 AC or AH OF (or error
code when there’s malfunction; on is displayed when the unit is displayed)
Warning:
After finishing operating this product, the wiring of air conditioner must be resumed.
Otherwise, it may affect the actual operation of user!
2.3.3.4 Operations after Commissioning
Sort and save data. Make detailed records of exceptions and troubleshooting methods during
commissioning for later maintenance and query. At last, make a commissioning report and hand it over
to users.
2.3.3.5 Precautions to Let Users Know after Commissioning
(1) Let users know where the master IDU is located and stick a label to the master IDU. Tell users
that modes of other IDUs are limited by the mode of master IDU.
(2) An ODU that has been in power-off status for more than 24 hours should be preheated for more
than eight hours before startup to prevent damaging compressors.
Summary of Contents for GMV5 Series
Page 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Page 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Page 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Page 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Page 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Page 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Page 321: ...JF00303868 ...