GREE Photovoltaic Direct-driven Inverter Multi VRF Units
117
2.3.2 Pre
-
commissioning Check
Installation environment check covers the heat exchange environment of unit and electromagnetic
radiant components. All requirements should comply with national and local electrical standards. For any
installation incompliance, records should be made for providing an analysis basis during refrigerating
system testing.
2.3.2.1 Installation Appearance Check
Installation appearance check covers whether pipeline installation complies with specifications,
whether refrigerant pipes and condensing drainage pipes are thermal insulated, and whether
Refrigerant pipes should be tidily installed, with outdoor and indoor disperse pipes leaning in the
required scope. For any installation incompliance, records should be made for providing an analysis
basis during refrigerating system testing.
Refrigerant pipes and condensing drainage pipes should not be exposed. If any pipe is exposed, an
immediate amendment is required to avoid serious loss.
2.3.2.2 Refrigerating System Check
1) Before commissioning, make sure that the stop valve of each module reaches the maximum
opening degree. Check whether there is any refrigerator oil leakage around the valve. If there is,
immediately check for leakage with soap bubbles or leak detectors. If confirming that leakage
exists, immediately stop commissioning and solve the problem before continuing commissioning.
Does the stop valve of
outdoor unit reach the
maximum opening
degree?
Oil
leakage?
2) Check system refrigerants before startup
Before the system is started, connect the liquid-tube valve of ODU with a high pressure gauge and
the air-tube valve of ODU with a low pressure gauge, and then read their values. In this case, high
pressure and low pressure of the system should be in balance status, and the difference between the
saturation temperature corresponding to the balanced pressure value and the environment temperature
(the higher in outdoor and indoor temperatures is taken as environment temperature) should not be
larger than 5°CK. If the difference is larger than 5°C K, it is required to check the ODU for leakage.
NOTE:
Guarantee that the system has never been started before this test. Otherwise, the high
pressure value will be over-higher than the environment temperature or the low pressure value will be
over-lower than the environment temperature.
Summary of Contents for GMV5 Series
Page 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Page 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Page 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Page 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Page 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Page 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Page 321: ...JF00303868 ...