1.5 Construction Organization Process
Design disclosure
Material purchasing
Review of onsite installation places
Indoor unit installation
Remote
control
installation
Communication
cables
connection
Power cable
connection
Drain pipe
installation
DIP switch
Insulation
Welding
Connecting the indoor unit and outdoor unit
Pilot run check
on indoor unit
Connecting the indoor
unit and outdoor unit
Insulation
Power cable
connection
Outdoor unit installation
Connecting pipe
installation
Purging, pressure maintaining
and leak detection
Welding
Pressure maintaining
and leak detection
Vacuum
pumping
Refrigerant charging
Open the valve
Unit commissioning
As-built drawing
User manual delivery
Air volume
Noise check
Above process is a general operation process, which can be adjusted in practice according to
local requirements.
Summary of Contents for GMV5 Series
Page 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Page 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Page 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Page 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Page 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Page 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Page 321: ...JF00303868 ...