GREE Photovoltaic Direct-driven Inverter Multi VRF Units
288
Removal procedure of 4
-way valve
Note: Before removing the 4-way valve, make sure no refrigerant is inside the pipeline and power has
been disconnected.
Step
Diagram
Operation Procedure
7
、
Check and
install the front
panels.
●Check various parts and
connection wires;
●If no problem is found, hook the
front panels and tighten the
screws.
3.3.3 Disassembly and Assembly
of Electronic Expansion Valve
Removal procedure of electronic expansion valve
Note: Before removing the electronic expansion valve, make sure no refrigerant is inside the pipeline
and power has been disconnected.
Step
Diagram
Operation Procedure
1
.
Loosen the
hooks at the
bottom of the
electric box and
the screws.
●Remove the upper and
lower front panels;
●Loosen the hooks at the
bottom of the electric box.
● Use a screwdriver to
unscrew the electric box.
2. Remove the
electric box.
●Disconnect internal and
external connection wires of
the electric box;
●Protect the internal parts
during the disassembly.
Summary of Contents for GMV5 Series
Page 202: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 198 Troubleshooting ...
Page 253: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 249 Troubleshooting ...
Page 256: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 252 Troubleshooting ...
Page 262: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 258 Troubleshooting ...
Page 274: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 270 2 Check oil balancer ...
Page 287: ...GREE Photovoltaic Direct driven Inverter Multi VRF Units 283 ...
Page 321: ...JF00303868 ...