Quick Print Checklist
After you have setup your GERBER SOLARA UV2 for the first time, use this checklist
to help guide you through the steps required for getting the machine ready for printing.
Refer to the page numbers provided next to each step for more information.
1
Turn on the printer
.
(Wait for Main Menu to appear)
2
Check the ink levels
.
(Replace ink cartridges if necessary)
3
Prime and clean the heads.
(Repeat every 4 hours of printing)
4
Attach or remove the material tables.
(For use with rigid material only)
5
Prep the material.
(Normailize and clean for best results)
6
Load the material.
(Vinyl or Rigid)
7
Adjust UV lamp height.
(High or Low)
8
Adjust Pinch wheel force
.
(High or Low)
9
Adjust UV shields.
(Overlap for vinyl, Gap for rigid)
10
Set beam height.
(Clockwise to raise, Counterclockwise to lower)
11
Close covers and select material type.
(Printer will auto-scan material)
12
Choose a print mode.
(Single or Multi job)
Using your selected RIP software
13
Open, adjust, and arrange your image(s).
14
Select the appropriate material profile and page size.
15
Select the print quality.
(3 pass or 6 pass)
16
Send the job to the printer.
17
Press F1 to begin printing your job.
18
Reminder message appears.
(Check settings then press any key)
19
UV Lamp warm-up.
(This may take a minute if the lamps are not on)
20
Job will begin printing.
p. 21
p. 41
p. 97
p. 60
p. 43
p. 49 or 60
p. 44
p. 44
p. 46
p. 42
p. 67
p. 78
p. 75
p. 75
p. 75
p. 16
p. 20
p. 75
p. 76
p. 78
Note: To
Pause
a job, press F1. Press again to resume printing.
To
Cancel
a job, press the
CANCEL
button on the control panel.
p. 83
Summary of Contents for SOLARA UV2
Page 1: ...GERBER SOLARA UV2 Ink Jet Printer Owner s Guide ...
Page 2: ......
Page 10: ......
Page 24: ......
Page 38: ...CHAPTER 3 38 Setting up the GERBER SOLARA UV2 ...
Page 74: ......
Page 96: ...CHAPTER 5 96 Printing Jobs on the GERBER SOLARA UV2 ...
Page 134: ......
Page 159: ......
Page 163: ...P79665A Rev D 83 Gerber Road South Windsor CT 06074 9864 USA www gspinc com ...