Servicing
39
4
Inspection intervals
Inspection intervals may vary from case to case, depending on the importance of
the equipment as well as environmental and operational conditions.
As a general rule, a first inspection is recommended after approximately 500
hours of operation (at the latest, however, after one year), then at least at the
same time as main motor maintenance.
During inspections, it will be checked whether:
-
The generator is running without abnormal noises or vibrations, which could
lead to bearing damage
-
Operating data are correct
-
Air intake is not blocked
-
The connection cables show no signs of wear
-
Electrical connections are securely fastened
-
Nuts on mounting bolts are properly tightened.
Summary of Contents for 20010 ED-S/DEDA
Page 2: ......
Page 4: ...2...
Page 17: ...Beschreibung 15 1 BESCHREIBUNG 1 1 Abmessungen 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 18: ...Beschreibung 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 52: ......
Page 54: ...2...
Page 67: ...Depiction 15 1 DEPICTION 1 1 Dimensions 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 68: ...Depiction 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 102: ......
Page 104: ...2...
Page 105: ...3 GEKO...
Page 106: ...4 GEKO...
Page 107: ...5 GEKO...
Page 111: ...9 0 0 1 0 2...
Page 112: ...10...
Page 113: ...11 0 3 0 4 OFF...
Page 114: ...12 0 5 OFF...
Page 115: ...13 0 6 0 6 1...
Page 116: ...14 0 6 2 0 6 3 0 6 4 0 6 5 0 6 6...
Page 117: ...15 1 1 1 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 118: ...16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 120: ...18 18 1 18 2 18 3 18 4 18 5 18 1 18 2 18 5 18 4 18 3 18 5...
Page 124: ...22 1 8 GEKO 400 230 50 2 3 1 9 1 9 1 17 7 1 9 2 17 8 1 9 3 17 4...
Page 127: ...25 1 11 2 DHD 1 ACEA E7 04 E3 96 E5 02 E4 07 E6 04 API CG 4 CH 4 CI 4 CI 4 Plus CJ 4 SAE...
Page 129: ...27 1 14 Zanardi ATEB 28 IEC 34 1 50 60 1 14 1 ATE 12...
Page 131: ...29 2 2 1 1 10 2 2...
Page 132: ...30 2 3 A B 0 5 C 1 0...
Page 133: ...31 2 4 2 5 2 5 7 2 5 4 5 1 5 2 2 4 1 10 2 5 2 5 7 5 10 200...
Page 134: ...32 2 5 2 5 1 2 5 2 5 MAX MIN MIN...
Page 135: ...33 2 5 3 START 20 9 19 10 2 5 4 1 11 17 12 2 5 2...
Page 136: ...34 2 5 5 2 5 6 GEKO DIN VDE 0100 551 DIN VDE 0100 410 16 14 BGV A3 TN C S...
Page 138: ...36 3 3 2 5 3 2 5 2 3 4 STOP 20 11 BLC 200 OFF 20 6 3 5 19 16 OFF 20 6...
Page 139: ...37 3 6 STOP 20 11 BLC 200 OFF 20 6 3 7 1 11 1 SAE 2 0 C 3 15 C 3 9 3 8 GEKO...
Page 141: ...39 4 500...
Page 143: ...41 5 1 17 11 21 2 21 3 21 3 5 2 5 2 21 2 21 1 21 2 5 3 17 5 6 1 2...
Page 144: ...42 5 4 5 5 500 17 10 80 C 17 10 5 7 1 11 2 5 2...
Page 145: ...43 5 6 3 4 1...
Page 146: ...44 5 7 17 9 1 10 5 MAX MIN 5 8 17 11 21 3 21 2 5 2 5 9 5 2...
Page 147: ...45 5 10 5 10 1 15 Deutz 1 3 2 4 2 1 5 1 Deutz 5 10 2 1 2 3 4 3 1 2 3...
Page 148: ...46 5 10 3 1 2 3 4 3 4 3 1 2 3 5 11 1 2 3 3 5 5 12 1...
Page 149: ...47 6 6 1 6 2 6 3 6 4...
Page 150: ...48 6 5 LDA SAE LDA...
Page 151: ...49 6 6 240 40 C...