![Geko 20010 ED-S/DEDA Operating Instructions Manual Download Page 86](http://html1.mh-extra.com/html/geko/20010-ed-s-deda/20010-ed-s-deda_operating-instructions-manual_2206055086.webp)
Servicing
34
2.5.5
Connecting the consumer
Before connecting the electrical consumer check to make sure the overall
load of the consumer does not exceed the generator power specified on
the identification plate of the generator.
Consumers can be connected even with a running generator. In this case,
make sure that the consumers are switched off when connecting them to
the electrical outlets.
2.5.6
Grounding the generator
GEKO generators are manufactured in accordance with the standard DIN VDE 0100/Part
551 and DIN VDE 0100/Part 410 with the protective measure of electrical separation of
the IT network, i.e. the neutral point of the generator is not connected to the generator
housing. Grounding by means of the grounding screw (Position 16-14) on the generator
and a grounding spike can therefore only be used for dissipation of static electricity
charges. The equipotential bonding conductor (green/yellow) must however lead to and
be connected to all consumers without a break.
However, if the generator is equipped with a protective circuit fault current protective
circuit (available as an option), the neutral point of the generator must be connected to
the generator unit housing and be connected by means of a grounding screw and possi-
bly a grounding spike with suitable equipotential bonding. It is important to ensure that,
after grounding and before operating the generator, the protective measure is checked
by an electrician in accordance with BGV A3 (measurement and test report) and the pro-
tective measure is tested as functional. Also, here a gap-free connection of all equipo-
tential bonding conductors and connection of the consumer must be ensured.
Now the generator is designed as a TN-C-S system.
The electrician is responsible for implementation of protective measures. Any protective
measures should be checked by an electrician for efficiency before commissioning of the
generator.
Summary of Contents for 20010 ED-S/DEDA
Page 2: ......
Page 4: ...2...
Page 17: ...Beschreibung 15 1 BESCHREIBUNG 1 1 Abmessungen 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 18: ...Beschreibung 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 52: ......
Page 54: ...2...
Page 67: ...Depiction 15 1 DEPICTION 1 1 Dimensions 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 68: ...Depiction 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 102: ......
Page 104: ...2...
Page 105: ...3 GEKO...
Page 106: ...4 GEKO...
Page 107: ...5 GEKO...
Page 111: ...9 0 0 1 0 2...
Page 112: ...10...
Page 113: ...11 0 3 0 4 OFF...
Page 114: ...12 0 5 OFF...
Page 115: ...13 0 6 0 6 1...
Page 116: ...14 0 6 2 0 6 3 0 6 4 0 6 5 0 6 6...
Page 117: ...15 1 1 1 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 118: ...16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 120: ...18 18 1 18 2 18 3 18 4 18 5 18 1 18 2 18 5 18 4 18 3 18 5...
Page 124: ...22 1 8 GEKO 400 230 50 2 3 1 9 1 9 1 17 7 1 9 2 17 8 1 9 3 17 4...
Page 127: ...25 1 11 2 DHD 1 ACEA E7 04 E3 96 E5 02 E4 07 E6 04 API CG 4 CH 4 CI 4 CI 4 Plus CJ 4 SAE...
Page 129: ...27 1 14 Zanardi ATEB 28 IEC 34 1 50 60 1 14 1 ATE 12...
Page 131: ...29 2 2 1 1 10 2 2...
Page 132: ...30 2 3 A B 0 5 C 1 0...
Page 133: ...31 2 4 2 5 2 5 7 2 5 4 5 1 5 2 2 4 1 10 2 5 2 5 7 5 10 200...
Page 134: ...32 2 5 2 5 1 2 5 2 5 MAX MIN MIN...
Page 135: ...33 2 5 3 START 20 9 19 10 2 5 4 1 11 17 12 2 5 2...
Page 136: ...34 2 5 5 2 5 6 GEKO DIN VDE 0100 551 DIN VDE 0100 410 16 14 BGV A3 TN C S...
Page 138: ...36 3 3 2 5 3 2 5 2 3 4 STOP 20 11 BLC 200 OFF 20 6 3 5 19 16 OFF 20 6...
Page 139: ...37 3 6 STOP 20 11 BLC 200 OFF 20 6 3 7 1 11 1 SAE 2 0 C 3 15 C 3 9 3 8 GEKO...
Page 141: ...39 4 500...
Page 143: ...41 5 1 17 11 21 2 21 3 21 3 5 2 5 2 21 2 21 1 21 2 5 3 17 5 6 1 2...
Page 144: ...42 5 4 5 5 500 17 10 80 C 17 10 5 7 1 11 2 5 2...
Page 145: ...43 5 6 3 4 1...
Page 146: ...44 5 7 17 9 1 10 5 MAX MIN 5 8 17 11 21 3 21 2 5 2 5 9 5 2...
Page 147: ...45 5 10 5 10 1 15 Deutz 1 3 2 4 2 1 5 1 Deutz 5 10 2 1 2 3 4 3 1 2 3...
Page 148: ...46 5 10 3 1 2 3 4 3 4 3 1 2 3 5 11 1 2 3 3 5 5 12 1...
Page 149: ...47 6 6 1 6 2 6 3 6 4...
Page 150: ...48 6 5 LDA SAE LDA...
Page 151: ...49 6 6 240 40 C...