![Geko 20010 ED-S/DEDA Operating Instructions Manual Download Page 83](http://html1.mh-extra.com/html/geko/20010-ed-s-deda/20010-ed-s-deda_operating-instructions-manual_2206055083.webp)
Servicing
31
2.4
Start-up
Check the oil level, see Section 2.5.2
If the oil level is low, refill the oil, see Section 5.7
Fill with fuel, see Section 2.5.4
Drain water separator, see Section 5.1
Bleed fuel line, see Section 5.2
2.4.1
Trial run
After preparations, conduct a short approximately 10 minute trial run.
Do not stress the motor.
Work during and after the trial run:
– Check the motor for leaks.
With the motor stopped:
– Check the oil level, see Section 2.5.2
– With low oil level, refill the oil, see Section 5.7
– Retighten the v-belt, see Section 5.10.
It is recommended that during the running-in period (approximately 200 operating
hours) the oil level be checked twice daily. After the running-in period checking the oil
level once daily is sufficient.
Summary of Contents for 20010 ED-S/DEDA
Page 2: ......
Page 4: ...2...
Page 17: ...Beschreibung 15 1 BESCHREIBUNG 1 1 Abmessungen 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 18: ...Beschreibung 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 52: ......
Page 54: ...2...
Page 67: ...Depiction 15 1 DEPICTION 1 1 Dimensions 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 68: ...Depiction 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 102: ......
Page 104: ...2...
Page 105: ...3 GEKO...
Page 106: ...4 GEKO...
Page 107: ...5 GEKO...
Page 111: ...9 0 0 1 0 2...
Page 112: ...10...
Page 113: ...11 0 3 0 4 OFF...
Page 114: ...12 0 5 OFF...
Page 115: ...13 0 6 0 6 1...
Page 116: ...14 0 6 2 0 6 3 0 6 4 0 6 5 0 6 6...
Page 117: ...15 1 1 1 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 118: ...16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 120: ...18 18 1 18 2 18 3 18 4 18 5 18 1 18 2 18 5 18 4 18 3 18 5...
Page 124: ...22 1 8 GEKO 400 230 50 2 3 1 9 1 9 1 17 7 1 9 2 17 8 1 9 3 17 4...
Page 127: ...25 1 11 2 DHD 1 ACEA E7 04 E3 96 E5 02 E4 07 E6 04 API CG 4 CH 4 CI 4 CI 4 Plus CJ 4 SAE...
Page 129: ...27 1 14 Zanardi ATEB 28 IEC 34 1 50 60 1 14 1 ATE 12...
Page 131: ...29 2 2 1 1 10 2 2...
Page 132: ...30 2 3 A B 0 5 C 1 0...
Page 133: ...31 2 4 2 5 2 5 7 2 5 4 5 1 5 2 2 4 1 10 2 5 2 5 7 5 10 200...
Page 134: ...32 2 5 2 5 1 2 5 2 5 MAX MIN MIN...
Page 135: ...33 2 5 3 START 20 9 19 10 2 5 4 1 11 17 12 2 5 2...
Page 136: ...34 2 5 5 2 5 6 GEKO DIN VDE 0100 551 DIN VDE 0100 410 16 14 BGV A3 TN C S...
Page 138: ...36 3 3 2 5 3 2 5 2 3 4 STOP 20 11 BLC 200 OFF 20 6 3 5 19 16 OFF 20 6...
Page 139: ...37 3 6 STOP 20 11 BLC 200 OFF 20 6 3 7 1 11 1 SAE 2 0 C 3 15 C 3 9 3 8 GEKO...
Page 141: ...39 4 500...
Page 143: ...41 5 1 17 11 21 2 21 3 21 3 5 2 5 2 21 2 21 1 21 2 5 3 17 5 6 1 2...
Page 144: ...42 5 4 5 5 500 17 10 80 C 17 10 5 7 1 11 2 5 2...
Page 145: ...43 5 6 3 4 1...
Page 146: ...44 5 7 17 9 1 10 5 MAX MIN 5 8 17 11 21 3 21 2 5 2 5 9 5 2...
Page 147: ...45 5 10 5 10 1 15 Deutz 1 3 2 4 2 1 5 1 Deutz 5 10 2 1 2 3 4 3 1 2 3...
Page 148: ...46 5 10 3 1 2 3 4 3 4 3 1 2 3 5 11 1 2 3 3 5 5 12 1...
Page 149: ...47 6 6 1 6 2 6 3 6 4...
Page 150: ...48 6 5 LDA SAE LDA...
Page 151: ...49 6 6 240 40 C...