GE Power Management
MM2 Motor Manager 2
8-11
8 MM2PC
®
SOFTWARE
8.4 USING MM2PC
®
8
8.4.5 VIEWING ACTUAL VALUES
The following example shows how to view and trend MM2 actual values.
1. Establish communications with the MM2 unit and select the Actual > Statistics menu item. This
opens the window showing the relevant monitored values. These values are continuously
updated while the window is open.
2. The MM2PC
®
trending feature can be used to plot measured parameters. The following values
can be trended:
•
Phase currents (
I
a
,
I
b
,
I
c
), ground current (
I
gnd
), motor load, thermal capacity, current unbal-
ance, analog input, voltage, and power.
3. Select the Actual > Trending menu item to open the trending window (see figure on following
page). Press the Setup button on the lower left of the window to enter the Graph Attribute page.
Summary of Contents for MOTOR MANAGER 2
Page 2: ......
Page 4: ......
Page 34: ...3 8 MM2 Motor Manager 2 GE Power Management 3 3 THEORY OF OPERATION 3 HARDWARE 3 ...
Page 80: ...5 12 MM2 Motor Manager 2 GE Power Management 5 5 A4 STATISTICS 5 ACTUAL VALUES 5 ...
Page 188: ...9 40 MM2 Motor Manager 2 GE Power Management 9 13 SOFT STARTER 9 STARTER TYPES 9 ...
Page 212: ...E 4 MM2 Motor Manager 2 GE Power Management E 1 CT ISOLATION APPENDIXE E ...
Page 220: ...iv MM2 Motor Manager 2 GE Power Management INDEX ...