Chapter 1. Installation
14
moisture.IQ User’s Manual
1.9 Making Electrical Connections
To open a
Weatherproof
moisture.IQ unit, use a large, flat-bladed screwdriver to turn the latch on the enclosure
cover.
To open an
Explosion-Proof
moisture.IQ unit, remove all 24 bolts from around the periphery of the enclosure
cover. Do not open an Explosion-Proof moisture.IQ unit that is energized.
To facilitate wiring, Weatherproof and Explosion-Proof moisture.IQ units are equipped with a hinging Chassis
that can be swung out and rested on a rod support. During normal use, the Chassis is fixed in place by a latch
mechanism located at the center of the mounting panel.
To release the Chassis from its locked position, the latch pin at the center of the mounting panel is pushed
upwards (in the direction indicated by the surrounding label). To lock the Chassis in place, the Chassis is
pushed down towards the mounting panel until the latch engages. In order to safely move the Chassis after
cables are installed, service loops for the Weatherproof units shall be at least 20 inches. Service loops for the
Explosion-Proof units shall be at least 18 inches
Make all connections to the back of the meter (see
on the next page):
•
The probe connections in the left two sections are for
Module A - Channels 1, 2, 3
.
•
The probe connections in the right two sections are for
Module B -Channels 4, 5, 6
.
•
For each Module, the left group of probe connections (
MIS
,
M-SERIES
,
O2T
and
OXYGEN
) are rated for
hazardous area use, while the right group of probe connections (
AUX IN/OUT
and
ALARMS
) are rated for
non-hazardous area use.
•
The connections along the bottom of the panel are for power input and remote devices.
WARNING!
To ensure the safe operation of this unit, you must install and operate the moisture.IQ as
described in this user’s manual. In addition, be sure to follow all applicable safety codes and regulations
for installing electrical equipment in your area.
WARNING!
Turn off the moisture.IQ before making any electrical connections.
WARNING!
The stainless steel Weatherproof enclosure must be properly grounded.
Summary of Contents for moisture.IQ
Page 1: ...Moisture and Oxygen 910 298 Rev E September 2017 bhge com moisture IQ User s Manual ...
Page 2: ......
Page 4: ... no content intended for this page ...
Page 12: ...Preface x moisture IQ User s Manual no content intended for this page ...
Page 45: ...moisture IQ User s Manual 33 Chapter 2 Operation ...
Page 49: ...moisture IQ User s Manual 37 Chapter 2 Operation ...
Page 50: ...Chapter 2 Operation 38 moisture IQ User s Manual ...
Page 110: ...Chapter 8 Troubleshooting 98 moisture IQ User s Manual no content intended for this page ...
Page 180: ... no content intended for this page ...
Page 181: ......