moisture.IQ User’s Manual
15
Chapter 1. Installation
1.9 Making Electrical Connections (cont.)
Figure 8: Rear Panel Connections
1.9.1 Using the Lever to Make Wiring Connections
Use the included levers to assist with wiring the cables to the terminal blocks, as shown in
below:
1.
Press and hold the lever against the terminal block.
2.
Insert the wire into the terminal block.
3.
Release the lever to secure the connection.
Figure 9: Using the Press Lock Lever
IMPORTANT:
To maintain good contact at each terminal block and to avoid damaging the pins on the connector,
pull the connector straight off (not at an angle). Make the cable connections while the connector is
away from the unit, and then push the connector straight on (not at an angle) when the wiring is
complete.
Proper connections and cabling are extremely important for accurate measurement. Use the correct cable type
for each probe and make sure the cables are not damaged during installation. See the sections that follow for
specific connection instructions.
ON/OFF Switch
Module A Hazardous Area Connections
Power Cord Receptacle
Module A Non-Hazardous Area Connections
Module B Hazardous Area Connections
Module B Non-Hazardous Area Connections
Summary of Contents for moisture.IQ
Page 1: ...Moisture and Oxygen 910 298 Rev E September 2017 bhge com moisture IQ User s Manual ...
Page 2: ......
Page 4: ... no content intended for this page ...
Page 12: ...Preface x moisture IQ User s Manual no content intended for this page ...
Page 45: ...moisture IQ User s Manual 33 Chapter 2 Operation ...
Page 49: ...moisture IQ User s Manual 37 Chapter 2 Operation ...
Page 50: ...Chapter 2 Operation 38 moisture IQ User s Manual ...
Page 110: ...Chapter 8 Troubleshooting 98 moisture IQ User s Manual no content intended for this page ...
Page 180: ... no content intended for this page ...
Page 181: ......