moisture.IQ User’s Manual
27
Chapter 1. Installation
1.10Establishing a Gas Flow Through the Oxygen Cell (cont.)
3.
Slowly open the flow control valve until the recommended flow of 2 to 2.5 SCFH is established on the
flow meter.
4.
When the proper flow is achieved, make sure the relief valve is closed by placing an object (e.g., your
finger, if the gas is non-corrosive) over the relief valve vent. Cover and uncover the relief valve vent and
verify that the flow meter shows no change in the flow rate. Keep the relief valve closed during
operation to minimize leakage in the sample system.
Figure 22: Gas Flow Schematic
Optimum Inlet
Pressure Limits
0.2 – 1.0 psig
Optimum Sample
Flow Range
2.0 – 2.5 SCFH
should vent to atmosphere.
Sample Gas Outlet and Relief Valve
Vent
Oxygen Cell
Electrolyte
Reservoir
Sample
Gas In
In
Out
Tee
Relief
Valve
Assembly
Flow Control
Valve
Flowmeter
Sample
Gas Out
Summary of Contents for moisture.IQ
Page 1: ...Moisture and Oxygen 910 298 Rev E September 2017 bhge com moisture IQ User s Manual ...
Page 2: ......
Page 4: ... no content intended for this page ...
Page 12: ...Preface x moisture IQ User s Manual no content intended for this page ...
Page 45: ...moisture IQ User s Manual 33 Chapter 2 Operation ...
Page 49: ...moisture IQ User s Manual 37 Chapter 2 Operation ...
Page 50: ...Chapter 2 Operation 38 moisture IQ User s Manual ...
Page 110: ...Chapter 8 Troubleshooting 98 moisture IQ User s Manual no content intended for this page ...
Page 180: ... no content intended for this page ...
Page 181: ......