GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
Chapter 8 - Replacement procedures
8 - 161
8-6-29-2
Remove the Bulkhead Plate
The Bulkhead Plate is used to secure the Upper UI Frame to the Lower UI Frame.
1.) Remove the seven fixing screws (see:
Figure 8-170 "The Bulkhead Plate" on page 8-161
).
2.) Remove the Bulkhead Plate and the Cable Clamp.
8-6-29-3
Install the Bulkhead Plate
1.) Position the Bulkhead Plate so it aligns with the holes for the fixing screws.
2.) Install the seven fixing screws as described below:
-
The two upper screws are M6 x 20, Torque: 8.5 Nm.
-
The next screw is M6 x 45, Torque: 8.5 Nm.
-
The lower left-most screw is M6 x 30, Torque: 8.5 Nm.
-
The three other lower screws are M6 x 25, Torque: 8.5 Nm. Two of the screws are also fixing
the Cable Clamp (see:
Figure 8-170 "The Bulkhead Plate" on page 8-161
3.) Install the Operator Panel, Lower.
4.) Install the Bulkhead Board.
5.) Install the two Speaker assemblies.
6.) Install the Operator Panel, Upper.
7.) Install the Operator Panel Knobs.
Figure 8-170 The Bulkhead Plate
Summary of Contents for GA000100
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5 ...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO ...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii ...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12 ...
Page 801: ......