GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
Chapter 8 - Replacement procedures
8 - 215
8-9-3-2
Pedal Mechanism removal procedure
1.) Disconnect the rods from the Pedal Mechanism. This is done by pulling the ball joints apart.
2.) Four screws are used to fix the Pedal Mechanism to the chassis. Unscrew and remove the screws.
3.) Lift away the Pedal Mechanism.
8-9-3-3
Pedal Mechanism installation procedure
1.) Position the Pedal Mechanism and install the four fixing screws (Torque: 20.5 Nm).
2.) Connect the rods by snapping on the ball joints.
3.) Verify that the pedals work as intended:
a.) Push down brake pedal (from “free” position), release it and verify the pedal to return quickly
up to half position.
b.) Try to move the VIVID E9 back and forward; and verify that the brake pedal stay in brake mode.
c.) Push down direction lock pedal and verify the pedal to return quickly.
d.) Move VIVID E9 and verify Casters stay in direction lock mode.
e.) At push down, observe the “Latches” to come over pivot T-Shape, and interfere by engaging.
4.) Install the Front Cover.
5.) Install the Top Cover.
6.) Install the Foot Rest Bumper.
Figure 8-215 Fixing screws
FIXING SCREWS FOR PEDAL MECHANISM
Summary of Contents for GA000100
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5 ...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO ...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii ...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12 ...
Page 801: ......