17 COMMISSIONING
17.7 PROTECTION SCHEMES
17
8.
Lower
V
an
until the PICKUP indicator goes out. This is the programmed Minimum Operating Voltage of
V
an
minus 2% of VT.
9.
Slowly raise
V
an
until the PICKUP indicator comes on. This is the Minimum Operating Voltage level.
10. Reduce
V
bn
until the PICKUP indicator goes out. This is the programmed Minimum Operating Voltage of
V
bn
minus 2% of VT.
11. Slowly raise
V
bn
until the PICKUP indicator comes on. This is the Minimum Operating Voltage level.
12. Reduce
V
cn
until the PICKUP indicator goes out. This is the programmed Minimum Operating Voltage of
V
cn
minus 2% of VT.
13. Slowly raise
V
cn
until the PICKUP indicator comes on. This is the Minimum Operating Voltage level.
b) FOR DELTA VTs
Test Connections per Figure 17–2: RELAY TEST WIRING – DELTA CONNECTION on page 17–4.
Pickup with One Phase For Operation:
1.
Inject
V
ab
=
V
cb
= nominal voltage into the bus voltage input of the relay. The PICKUP indicator should be
off.
2.
Slowly lower
V
ab
until the PICKUP indicator comes on. This is the pickup voltage.
3.
Continue to lower
V
ab
until the PICKUP indicator goes out. This is the Minimum Operating Voltage minus
2% of VT.
4.
Raise
V
ab
until the PICKUP indicator comes on, and continue to increase until the indicator goes out. This
is the reset voltage, which should be the pickup value plus 2% of VT.
5.
Repeat steps 1 through 4 except adjust
V
bc
.
Pickup with Two or Three Phases For Operation:
1.
Inject
V
ab
= nominal voltage and
V
cb
= a voltage between the Minimum Operating Voltage and the pickup
voltage into the bus voltage input of the relay. The PICKUP indicator should be on.
2.
Slowly raise
V
cb
until the PICKUP indicator goes out. This is the reset voltage, which should be the pickup
value plus 2% of VT.
3.
Reduce
V
cb
until the PICKUP indicator comes on. This is the pickup voltage of
V
cb
.
4.
Continue to lower
V
cb
until the PICKUP indicator goes out. This is the programmed Minimum Operating
Voltage of
V
cb
minus 2% of VT.
5.
Slowly raise
V
cb
until the PICKUP indicator comes on. This is the Minimum Operating Voltage level.
6.
Reduce
V
ab
until the PICKUP indicator goes out. This is the programmed Minimum Operating Voltage of
V
ab
minus 2% of VT.
7.
Slowly raise
V
ab
until the PICKUP indicator first comes on and then goes out. This is the reset voltage,
which should be the pickup value plus 2% of VT.
8.
Lower
V
ab
until the PICKUP indicator comes on. This is the pickup voltage of
V
ab
.
Summary of Contents for 750
Page 2: ......
Page 4: ......
Page 124: ...8 14 750 760 Feeder Management Relay GE Power Management 8 12 INSTALLATION 8 S1 RELAY SETUP 8 ...
Page 488: ...A 4 750 760 Feeder Management Relay GE Power Management A 1 FIGURES AND TABLES APPENDIXA A ...
Page 492: ...C 2 750 760 Feeder Management Relay GE Power Management C 1 WARRANTY INFORMATION APPENDIXC C ...
Page 502: ...x 750 760 Feeder Management Relay GE Power Management INDEX ...
Page 503: ...GE Power Management 750 760 Feeder Management Relay NOTES ...