G900X/G950 Installation and Maintenance Manual – Software, Configuration, and Calibration
Page 15-43
190-00719-00
Revision D
14.
Repeat the turn-and-stop process until the PFD advises that a successful calibration is
complete. The GRS 77 AHRS then enters its normal operational mode. Press the ENT
button on the PFD to conclude this procedure.
15.
Repeat the turn-and-stop process until the PFD advises that a successful calibration is
complete. The GRS 77 AHRS then enters its normal operational mode. Press the ENT
button on the PFD to conclude this procedure.
16.
Proceed to Section 15.4.3.5 for the engine run-up procedure.