
Power up
4-2
4.1.2
Initialisation steps in daily use
Once the system is configured and a satellite profile is active, the startup sequence is as
follows:
• ACU POST
• ADU Initializing
• ADU SW upload (If the software versions in the ADU and ACU are not the same, a
software update is done during startup.)
• ADU POST
• READY
• POINTING ANTENNA
• ACQUIRING SIGNAL
• TRACKING
4.1.3
FV-110 operational
When the display shows
TRACKING
and the LED
Logon
is steady green, the system is
operational.
Summary of Contents for FV-110
Page 1: ...KU BAND ANTENNA FV 110 OPERATOR S MANUAL www furuno com Model...
Page 54: ...To install the dual antenna mode optional 2 30 This page is intentionally left blank...
Page 60: ...Interfaces of the VMU 3 6 This page is intentionally left blank...
Page 116: ...SNMP support 5 54 This page is intentionally left blank...
Page 122: ...Installation check list Functional test in harbor 6 6 This page is intentionally left blank...
Page 142: ...Modem Cable iNFINITI iDirect VSAT modem B 4 This page is intentionally left blank...
Page 178: ...Linkway S2 modem C 36 This page is intentionally left blank...
Page 192: ...E 4 This page is intentionally left blank...
Page 204: ...RF interference F 12 This page is intentionally left blank...
Page 218: ...OEM declaration H 2 H 2 OEM declaration...
Page 220: ...Eutelsat S A ESV Summary Sheet H 4 H 4 Eutelsat S A ESV Summary Sheet...
Page 221: ...Russian Maritime Register of Shipping H 5 H 5 Russian Maritime Register of Shipping...
Page 222: ...Russian Maritime Register of Shipping H 6...
Page 223: ...Russian Maritime Register of Shipping H 7...
Page 229: ...OD 1 15 Feb 2017 H MAKI...
Page 230: ...OD 2 16 Feb 2017 H MAKI...
Page 232: ......