Status signalling with LEDs and status messages
7-7
7.3
Status signalling with LEDs and status messages
Built-In Test Equipment
The ADU and the ACU have a Built-In Test Equipment (BITE) function in order to make
fault diagnostics easy during service and installation. The BITE test is performed during:
• Power On Self Test (POST), which is automatically performed each time the system is
powered on.
• Person Activated Self Test (PAST), which is initiated by starting a self test in the web
interface
HELPDESK > Self test
.
For details on error messages after a POST or a self test see
Event list
on page 7-2.
Means of signalling
The FV-110 provides various methods for signalling the system status.
LEDs
on the front
panel of the ACU are used to signal:
• Power on/off
• Logon
• Fail/Pass
The built-in web interface of the ACU shows any events (BITE error codes) with a short
message describing each error. This is also displayed in the ACU.
In an error situation, one of the following system status messages may be shown:
• ACU POST error
• ADU POST error
• SAFE MODE (plus information about the specific error, see
System messages
on
page G-1).
7.3.1
LEDs of the ADU modules
Each ADU module has a Power and a Service LED.
For a list of modules see
Removal and replacement of ADU modules
on page 7-9.
LED
Behaviour
Description
Power Steady green
Power supply OK
Off
No power
Service Steady green
Module ok, application
running.
Flashing green
Waiting for upload
Flashing red/green Uploading application
Steady red
Module error or loading error
Table 7-1: LEDs of the ADU modules
Summary of Contents for FV-110
Page 1: ...KU BAND ANTENNA FV 110 OPERATOR S MANUAL www furuno com Model...
Page 54: ...To install the dual antenna mode optional 2 30 This page is intentionally left blank...
Page 60: ...Interfaces of the VMU 3 6 This page is intentionally left blank...
Page 116: ...SNMP support 5 54 This page is intentionally left blank...
Page 122: ...Installation check list Functional test in harbor 6 6 This page is intentionally left blank...
Page 142: ...Modem Cable iNFINITI iDirect VSAT modem B 4 This page is intentionally left blank...
Page 178: ...Linkway S2 modem C 36 This page is intentionally left blank...
Page 192: ...E 4 This page is intentionally left blank...
Page 204: ...RF interference F 12 This page is intentionally left blank...
Page 218: ...OEM declaration H 2 H 2 OEM declaration...
Page 220: ...Eutelsat S A ESV Summary Sheet H 4 H 4 Eutelsat S A ESV Summary Sheet...
Page 221: ...Russian Maritime Register of Shipping H 5 H 5 Russian Maritime Register of Shipping...
Page 222: ...Russian Maritime Register of Shipping H 6...
Page 223: ...Russian Maritime Register of Shipping H 7...
Page 229: ...OD 1 15 Feb 2017 H MAKI...
Page 230: ...OD 2 16 Feb 2017 H MAKI...
Page 232: ......