FV-110 system
1-5
FV-110 ADU interface
All communication between the ADU and the ACU passes through a single standard
50 Ohm cable (with N connector) through the rotary joint. No cable work is required
inside the radome.
Installation friendly
Four lifting brackets (included in the delivery) and reuse of packing material help getting
the ADU safely into place. Satellite profile parameters are entered using the built-in web
server of the ACU, using a PC.
Service friendly
The system configuration is saved in two modules, there is no loss of data at repair. The
large service hatch of the radome gives easy access to the ADU on site. The service
switch in the ADU stops the DC Motor Driver modules and turns the BUC off. The
service tools for replacing modules are placed on a tool holder inside the radome.
All modules have a service and power LED status indicator. Each module is encapsulated
in a metal box with self-contained mounting bolts.
If necessary, belts and modules can be exchanged through the service hatch on site.
You can do remote diagnostics and service with the ADU. Its built-in test equipment
checks constantly the ADU’s modules for proper functioning, it monitors and logs
information for all modules. The ADU performs a POST (Power On Self Test) and you
can request a self test (PAST, Person Activated Self Test) and Continuous Monitoring
(CM). Error codes can be read out in the web interface and in the display of the ACU.
ADU software is updated automatically when making a software update of the ACU.
1.1.2
Antenna Control Unit (ACU)
The ACU is the central unit in the system. It contains all user interfaces and manages all
communication between the ADU and the connected VMU, a connected PC and an
optional FleetBroadband service communication line. The ACU has a display, status
LEDs and a keypad. It provides a DHCP client. During configuration you can configure
heading offset, save satellite and VMU setups and enter
No Transmit Zones
(blocking
zones in which the ADU does not transmit).
The ACU provides DC power to the ADU through a single coaxial cable.
Summary of Contents for FV-110
Page 1: ...KU BAND ANTENNA FV 110 OPERATOR S MANUAL www furuno com Model...
Page 54: ...To install the dual antenna mode optional 2 30 This page is intentionally left blank...
Page 60: ...Interfaces of the VMU 3 6 This page is intentionally left blank...
Page 116: ...SNMP support 5 54 This page is intentionally left blank...
Page 122: ...Installation check list Functional test in harbor 6 6 This page is intentionally left blank...
Page 142: ...Modem Cable iNFINITI iDirect VSAT modem B 4 This page is intentionally left blank...
Page 178: ...Linkway S2 modem C 36 This page is intentionally left blank...
Page 192: ...E 4 This page is intentionally left blank...
Page 204: ...RF interference F 12 This page is intentionally left blank...
Page 218: ...OEM declaration H 2 H 2 OEM declaration...
Page 220: ...Eutelsat S A ESV Summary Sheet H 4 H 4 Eutelsat S A ESV Summary Sheet...
Page 221: ...Russian Maritime Register of Shipping H 5 H 5 Russian Maritime Register of Shipping...
Page 222: ...Russian Maritime Register of Shipping H 6...
Page 223: ...Russian Maritime Register of Shipping H 7...
Page 229: ...OD 1 15 Feb 2017 H MAKI...
Page 230: ...OD 2 16 Feb 2017 H MAKI...
Page 232: ......