4.
Verify proper operation by observing the LEDs:
•
Chassis devices – Make sure the LED on each power supply is a solid green. Also make sure that some
of the port LEDs on each module momentarily light up. The LEDs indicate that the device is performing
diagnostics. After the diagnostics are complete, the LEDs will be dark except for the ones that are
attached by cables to other devices. If the links on these cables are good and the connected device is
powered on, the link LEDs will light.
NOTE:
If all of the LEDs on a module do not light up during the diagnostics, this does not indicate an error.
Only some of the LEDs are lighted during the diagnostics.
•
Fixed-port devices (Stackable devices) – All the port LEDs should flash momentarily, usually in
sequence, while the device performs diagnostics. After the diagnostics are complete, the LEDs will be
dark except for the ones that are attached by cables to other devices. If the links on these cables are
good and the connected device is powered on, the link LEDs will light.
For more details on specific LED conditions after system start-up, see
“LEDs” on page 9-17.
Attaching a PC or Terminal
To assign an IP address, you must have access to the
Command Line Interface (CLI)
.
The CLI is a text-based
interface that can be accessed through a direct serial connection to the device and through Telnet connections.
The CLI is described in detail in the
Foundry Switch and Router Command Line Interface Reference
.
You need to assign an IP address using the CLI. You can access the CLI by attaching a serial cable to the
Console port. After you assign an IP address, you can access the system through Telnet, the Web management
interface, or IronView.
To attach a management station using the serial port:
1.
Connect a PC or terminal to the serial port of the system using a straight-through cable. The serial port has a
male DB-9 connector.
NOTE:
You need to run a terminal emulation program on the PC.
2.
Open the terminal emulation program and set the session parameters as follows:
•
Baud: 9600 bps
•
Data bits: 8
•
Parity: None
•
Stop bits: 1
•
Flow control: None
When you establish the serial connection to the system, press Enter to display one of the following CLI prompts in
the terminal emulation window:
•
NetIron>
•
BigIron>
•
FastIron>
•
FastIronII>
•
TurboIron>
•
ServerIron>
NOTE:
If you install Layer 2 Switch code on a Layer 3 Switch, the command prompt begins with “
SW-
” to
indicate the software change. This is true even if you change the system name.
Summary of Contents for Switch and Router
Page 2: ...December 2000 Copyright 2000 by Foundry Networks Inc ...
Page 26: ...Foundry Switch and Router Installation and Configuration Guide xxvi December 2000 ...
Page 64: ...Foundry Switch and Router Installation and Configuration Guide 2 34 December 2000 ...
Page 162: ...Foundry Switch and Router Installation and Configuration Guide 5 38 December 2000 ...
Page 196: ...Foundry Switch and Router Installation and Configuration Guide 6 34 December 2000 ...
Page 208: ...Foundry Switch and Router Installation and Configuration Guide 7 12 December 2000 ...
Page 236: ...Foundry Switch and Router Installation and Configuration Guide 8 28 December 2000 ...
Page 258: ...Foundry Switch and Router Installation and Configuration Guide 9 22 December 2000 ...
Page 420: ...Foundry Switch and Router Installation and Configuration Guide 13 32 December 2000 ...
Page 442: ...Foundry Switch and Router Installation and Configuration Guide 14 22 December 2000 ...
Page 554: ...Foundry Switch and Router Installation and Configuration Guide 15 112 December 2000 ...
Page 574: ...Foundry Switch and Router Installation and Configuration Guide 16 20 December 2000 ...
Page 626: ...Foundry Switch and Router Installation and Configuration Guide 17 52 December 2000 ...
Page 682: ...Foundry Switch and Router Installation and Configuration Guide 18 56 December 2000 ...
Page 826: ...Foundry Switch and Router Installation and Configuration Guide 20 20 December 2000 ...
Page 994: ...Foundry Switch and Router Installation and Configuration Guide 26 10 December 2000 ...
Page 1004: ...Foundry Switch and Router Installation and Configuration Guide B 6 December 2000 ...
Page 1044: ...Foundry Switch and Router Installation and Configuration Guide C 40 December 2000 ...
Page 1048: ...Foundry Switch and Router Installation and Configuration Guide D 4 December 2000 ...
Page 1070: ...Foundry Switch and Router Installation and Configuration Guide Index 18 December 2000 ...