Installing a Foundry Layer 2 Switch or Layer 3 Switch
December 2000
2 - 5
Figure 2.1
Installing a module
Removing Modules
To remove a module from the chassis, do the following:
1.
Put on an ESD wrist strap and attach the clip end to a metal surface (such as an equipment rack) to act as
ground.
WARNING:
To avoid risk of shock, do not attach the clip end to the air flow panel of the power supply.
2.
Loosen the two screws on the ends of the module.
3.
Pull the card ejectors towards you, and away from the module front panel. The card will unseat from the
backplane.
4.
Pull the module out of the chassis and place in an anti-static bag for storage.
5.
Cover the slot with the blank face plate that shipped with the chassis.
CAUTION:
If you remove a module and do not replace it, cover the slot opening with one of the blank plates
you received with the device to provide additional safety and airflow for the system.
NOTE:
Modules can be installed and removed when the unit is powered on (hot swap). You do not need to
power the system down. You do not need to change the slot’s configuration unless you plan to insert a
different type of module. See “Swapping Modules (Chassis devices only)” on page 2-31.
Summary of Contents for Switch and Router
Page 2: ...December 2000 Copyright 2000 by Foundry Networks Inc ...
Page 26: ...Foundry Switch and Router Installation and Configuration Guide xxvi December 2000 ...
Page 64: ...Foundry Switch and Router Installation and Configuration Guide 2 34 December 2000 ...
Page 162: ...Foundry Switch and Router Installation and Configuration Guide 5 38 December 2000 ...
Page 196: ...Foundry Switch and Router Installation and Configuration Guide 6 34 December 2000 ...
Page 208: ...Foundry Switch and Router Installation and Configuration Guide 7 12 December 2000 ...
Page 236: ...Foundry Switch and Router Installation and Configuration Guide 8 28 December 2000 ...
Page 258: ...Foundry Switch and Router Installation and Configuration Guide 9 22 December 2000 ...
Page 420: ...Foundry Switch and Router Installation and Configuration Guide 13 32 December 2000 ...
Page 442: ...Foundry Switch and Router Installation and Configuration Guide 14 22 December 2000 ...
Page 554: ...Foundry Switch and Router Installation and Configuration Guide 15 112 December 2000 ...
Page 574: ...Foundry Switch and Router Installation and Configuration Guide 16 20 December 2000 ...
Page 626: ...Foundry Switch and Router Installation and Configuration Guide 17 52 December 2000 ...
Page 682: ...Foundry Switch and Router Installation and Configuration Guide 18 56 December 2000 ...
Page 826: ...Foundry Switch and Router Installation and Configuration Guide 20 20 December 2000 ...
Page 994: ...Foundry Switch and Router Installation and Configuration Guide 26 10 December 2000 ...
Page 1004: ...Foundry Switch and Router Installation and Configuration Guide B 6 December 2000 ...
Page 1044: ...Foundry Switch and Router Installation and Configuration Guide C 40 December 2000 ...
Page 1048: ...Foundry Switch and Router Installation and Configuration Guide D 4 December 2000 ...
Page 1070: ...Foundry Switch and Router Installation and Configuration Guide Index 18 December 2000 ...