80
5. Tail Surfaces
5.1 Tensioning the Rear Fuselage
a) Ensure that the front of the vertical fin is not yet fixed to its mount.
b) Check that the rear fuselage is sitting approximately squarely, then tighten the
bolts around the rear fuselage, remembering to use threadlock.
If there is some “set” in the rear fuselage, get a helper to twist it straight
whilst you do the bolts up. This will help when the cables are used to
correct the “set” as detailed below.
c)
Ensure the fuselage sets at the right vertical alignment.
This is done by tensioning the turnbuckles on the C cables individually.
Sighting between TU14 forward cabin tube and fin whilst standing
ahead of aircraft will confirm vertical alignment. If turnbuckle tension
required is significantly asymmetric then shortening the length of the D
cable on the opposite side to the turnbuckle that requires the greatest
tension will help. To do this slacken the turnbuckles and undo one end
of the D cable to make the twists, replace and re-tension turnbuckles.
d)
Final tension of C cables should be around 5Kg for a 10mm displacement
when cable is pulled at right angles downwards and mid cable length point,
using a travel scale or similar
A and B cables should not be loose but don‟t need great tension.
e) E and F cables should have light to firm tension. Their tension has an influence
over curve in the vertical plane of the fuselage longeron tube
– TU2 and 4‟s.
Asymmetric tension may pull the fin out of vertical. If required adjust tension so
all is straight by winding or unwinding the cable, and reattaching. A helper is
useful to apply pressure to the frame to help reattaching.
f) Finally secure all cables where they cross with a small length of split thin wall
tubing (the pitot tubing can be used) over one cable, and a cable tie.
Figure 91 securing crossing cables
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...