155
c) With cowlings all attaching and aligned with each other satisfactorily the holes
can be opened up to 5mm and the captive nut cowling clips slid over ito
position. Cowlings can then be attached with the 5mm cowling bolts.
Alternatively if quick release fastners are to be fitted they can be fitted now, or
later. If later make sure you have enough Cleco‟s / skinpins or small nuts and
bolts to fix all cowling peices toghther formly
– which will be required during
the next steps.
d) Cowlings need to be aligned with the spinner
(note that cowlings are made for
spinners of around 20 -23cm diameter
– alignment with larger or smaller ones
may not be possible). The UK standard fit is a 40mm prop spacer and
kievprop 23cm diameter spinner. Fit these at this stage. Then lift the front of
the cowling to align. To hold this position make a support out of some wood
sheet or stout cardboard as shown below. The support should be a similar
diameter to the spinner
.
Figure 191 cowling support - horseshoe shaped to fit behind engine drive flange.
Figure 192 spinner / cowling alignment
= to spinner radius
10-15mm gap
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...