b) Apply threadlock to the bolt securing guide
7
to the front vertical
tu14
and
tighten firmly, but take care not to distort or crush the tube.
This should be done at this stage as the bolt holding this bracket is not
easily accessible later.
Whilst the spacer should prevent crushing of the tube, it is better not to
rely on it. It is permissible for the spacer to remain slightly loose, as
under load it will still prevent excessive deformation of the tube.
Do not distort the tube.
c) Mount the U-brackets
5
to the lower cabin triangle tubes
tu12
Note the use of a spacer sleeve in the tubes.
The studs should be long end downwards to mount the bottom of the
firewall and the front of the fuselage covering later.
If the bolt thread sticking out of the nut securing the U brackets to the
TU14 fouls the TU12 end file the end of the TU12 to provide clearance
d) Mount the steel diagonal-brace
tu43
to the bottom of the stud through the port
tube. Use thin plastic washers
26
and steel washers
25
.
The other end of the brace will be attached to the rudder pedal mounts
later. The brace may be supplied attached to the mounts, have a look
under the packaging.
Thin plastic washers may be used to take up any slack between the
tubes and U-brackets.
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...