50
a) If not already done, attach the aileron horn
to the machined „top hat‟ with 4mm
bolts.
Rivets must not be used here, as the fitting carries all the tension loads
from the elevator controls. Use the bolts supplied, do not use any
unknown strength bolts. Attach the top hat to the front vertical
tu14
by
the pivot bolt through the aileron horn, inserted from the rear.
The pivot bolt must be assembled in the following order:
Bolt head
Large metal washer
Plastic washer
Aileron horn
Rubber grommet
Plastic saddle washer
Front vertical tu14
Plastic saddle washer
Large metal washer
Small metal washer if necessary for spacing)
Castle nut and split pin
b) When all is in final position, this should be done up tight enough to remove
excess play but without discernable friction.
c) Fit the stick to the stick pivot fork with thin nylon washers either side of the
stick in the stick pivot fork.
d) The pivot bolt should be done up just tight enough to remove any play but
allow movement of the stick without discernable friction.
e) Rubber rings are is supplied to act as elevator stops. They should be
positioned on the stick so as to engage on the edge of the fork jaws,
They may be secured by glue and/or cable ties above and below them.
f) Fit the plastic torque-tube bearing into the rear pivot support.
The bearing is inserted from the front. Then if the forward pivot bolt were to
fail, the stick would still be held in place by this bearing.
Figure 54 torque-tube bearing.
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...