247
Nynja Build manual 1.0
Figure 332 rear securing strap.
c) Pass the upper securing straps around the upper rear fuselage tubes above,
but not around, the turnbuckles.
The straps will have to be slid back down the tubes for them to reach.
d) Burn a hole through each strap where the Velcro is, and secure with small
pan-head bolts, with the pan-head towards the tube.
e) Burn holes in the lower Velcro straps and secure with small pan-head bolts.
f) Connect the lower straps to the rear securing straps using the click-in buckle.
Note that the lower fixing do not go around the rear cabin uprights TU6. The
baggage bag should be free to move upwards and backwards or access to the
fuel tank fillers will be restricted.
26.5 Controls
a) Mount all the control surfaces and secure with split pins, unless further
transportation is to occur.
b) Check the full and free movement, in the correct sense, of all combinations of
the controls.
c) Check the neutral positions of the flaps and their operation.
The flaps should be set with the centre of their trailing edges 125mm
above the corner of the fuselage fairing
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...