139
b) At the rear of the
tu34
support frame, the tubes are flattened slightly and fit
onto the bolt end protruding upwards from the fuselage at the trailing edge
attachments.
Figure 165 Rear ends of windscreen support frame
c) Slip one of the large diameter heat-shrink rings over each leading edge, and fit
the covered wings to the fuselage.
d) Ensure that the
tu34
tubes fit behind the leading edge with around 3-5mm of
clearance, and that the curves of the top tubes match the curve of the large
innermost wing battens, to get a good fit between the Lexan windscreen and
the wing.
Use a long straight edge for this. It may be necessary to tweak the
stainless steel curved piece which joins the upright tubes to the curved
upper tubes, slide it up or down inside the vertical and curved tubes to
get the best position, and to re-drill the holes which secure it.
In the correct position the tubes should be centred, with the centres of
the tops of the tubes around 900mm apart, so that the upper curved
tubes are run parallel back to the rear attachments.
The cabin uprights will then lean slightly outwards from their bases.
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...