214
Nynja Build manual 1.0
The rear edge of the windscreen sides should earlier have had two
lines of 1x10mm self adhesive foam applied, and the rear windows
forwards edge a beading strip and a line of 3x20mm self adhesive foam
applied. If not do it now!
The lexan overlap should be cut to match the edges of this foam.In
addition a small cut out area to allow the lexan to pass around the end
of the rear upper fuselage longeron TU2.
18.3.4
Fittings
a) Drill through the centre of the upper door frame lower tube 480mm from the
forward edge of the door using a 6mm drill bit to accept the door handle.
This measurement doesn‟t need to be exact, but should be even
between sides. And either be through a rivet position or between two.
b) Use the handle / catch parts from the main kit, inserting the handle through the
hole in the doorframe.
c) On the inside fit a thin plastic washer followed by the plain nut, hooped shape
handle and Nyloc nut.
d) Tighten the nuts against one another to lock the parts into position.
Adjust the position of the nuts so that some friction is felt when rotating
the handle. The hooped handle can be left as is or the hooped part cut
off to leave a flat lever as desired.
Some protection to stop the lever scratching the lower door tube is
desirable. In Figure 270 below the lever has been fitted with some
heatshrink (the black band) to achieve this.
Figure 270 upper door catch (this one has had the hooped part cut off, is bent inwards slightly
and has a sk
iffy cap fitted to provide a handle ‘knob’)
e) Fit the forward catch by drilling a 5mm hole in the forward vertical of the upper
door frame just above the bend radius (see Figure 308)
.
Assemble the parts with two 3mm plastic washers, and a saddle
washer between catch and doorframe.
f) Adjust the tension to achieve some friction.
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...